Renewables

LM Wind Power breaks ground for wind turbine blade plant

LM Wind Power

Published

July 14, 2016

Country

Comments

0

Share

Published:

July 14, 2016

Country:

Comments:

0

Share

A facility in Bergama Organized Industrial Zone (BOSBI), set to start production by the middle of next year, is designed to produce enough wind blades for the capacity of 500 MW per year, with an option to raise it to around 2 GW.

LM Wind Power, the world’s largest manufacturer in the segment, broke ground at its 17 hectares of land in Bergama in Turkey’s west. The project is expected to create 450 skilled technical jobs, the Danish company’s statement said. They will range from manufacturing operations, to technical engineering, services, administration and ancillary support.

Vatansever: The event marks the beginning of a new hub for green industry.

The event marks the beginning of a new hub for green industry, which signals a prosperous future for the zone, the city of Bergama, for Izmir and for the wider Turkish economy, said Hüseyin Vatansever, president of BOSBI.

“In addition to the obvious geographical and logistical benefits this region presents, there’s a noteworthy local talent pool which can benefit from the opportunities. LM Wind Power has an excellent track record for growing and retaining local people from the communities wherever we operate,” said Ben Malefijt, LM Wind Power’s vice president for industrialization.

The investment is supported by commitments from a major customer, the company said. The new plant will be LM Wind Power’s fourteenth.

Tags:

Related Articles

europe flexibility seasonal balancing iea report

Flexibility needs to be met by demand response, batteries, hydrogen, but also thermal, hydropower plants – IEA

03 May 2024 - The report Managing the Seasonal Variability of Electricity Demand and Supply analyzes the situation in Europe, India, and Indonesia

IPTO suspends all electricity imports until May 7 to protect the Greek system

Greece suspends electricity imports until May 7 to protect system

03 May 2024 - The Greek Independent Power Transmission Operator (IPTO) has announced the suspension of all electricity imports during the hours around noon

Two agrosolar power plants are planned to be constructed in Serbia

Two agrisolar projects launched in northern Serbia

02 May 2024 - In the vicinity of Kikinda in Serbia, two new agrisolar projects are underway: Solar Power Plant Delta and Brankov solar

el-dorado-electricity-imports-north-macedonia-rke

North Macedonia: ‘Solar El Dorado’ cuts electricity imports to 2.75%

02 May 2024 - In 2023, North Macedonia's new solar capacity increased by as much as 251% compared to 2022