Renewables

PPC Renewables to renew 11 wind power units

Published

July 1, 2016

Country

Comments

comments icon

0

Share

Published:

July 1, 2016

Country:

Comments:

comments icon

0

Share

The hybrid power system in the Greek island of Ikaria is 85% finished. The 6.85 MW facility with wind turbines, pump storage reservoirs and photovoltaic units should be launched before the end of next year, said Fotis Vrotsis, chief executive of PPC Renewables SA, locally also known as Deian.

Speaking at an energy conference about the future of renewables beyond 2020, he noted the company is about to start refurbishing and modernizing equipment and wind generators at eleven sites and islands in the Aegean. The event was organized by relevant ministries of Greece and Germany in cooperation with the Hellenic-German Chamber of Commerce and Industry.

Vrotsis added PPC Renewables is researching, developing and installing geothermal energy units to tap on power production potential. In 2020 installed power could reach 170 MW with additional potential of 230 MW, he said. The company has a license to research and develop projects of an overall 120 ΜW. Sites to be auctioned by the energy ministry are estimated to have capacity of 20 ΜW, he said.

The subsidiary of the state-owned power utility takes into account the stance of local communities and the environmental, economic and local costs and benefits in the process of design and implementation of projects, according to Vrotsis. Greek and German participants were presented with interactive maps with PPC Renewables’ hydroelectric, wind and photovoltaic units, while the emphasis was on energy storage methods in non-interconnected islands.

Related Articles

serbia electricity market rules ems nikola tosic balancing

Serbia’s new electricity market rules bring important changes

12 February 2026 - Nikola Tošić, Market Division Manager at Serbia's transmission system operator EMS, explains new electricity market rules

YESS Power integrates battery system with Novaci PV plant in North Macedonia

YESS Power integrates battery system with Novaci PV plant in North Macedonia

12 February 2026 - Turkey-based YESS Power has commissioned, as a contractor, the first grid-scale BESS in North Macedonia and the region

romania ppc bess battery salbatica wind farm

PPC to install 60 MWh battery system at Sălbatica wind farm

11 February 2026 - PPC operates the Sălbatica 1 and Sălbatica 2 wind farms, with a combined capacity of 140 MW, located in Tulcea County

wind farm bijela alcazar

Montenegro clears environmental impact study for 118.8 MW Bijela wind farm

11 February 2026 - The Environmental Protection Agency has approved the environmental impact assessment for the 118.8 MW Bijela wind farm