Energy Crisis

Two coal plants in Western Balkans go offline due to malfunctions

Two coal plants Western Balkans offline malfunctions Kosovo a Pljevlja

Photo: Kosovo A (EPS)

Published

September 27, 2022

Country

,

Comments

comments icon

1

Share

Published:

September 27, 2022

Country:

,

Comments:

comments icon

1

Share

Coal-fired thermal power plants Pljevlja in Montenegro and Kosovo A broke down, adding to concerns about the possibility of blackouts in the region in the winter.

Electric power systems in the Western Balkans are strained by the lack of coal and this year’s severe drought, which almost depleted hydropower reservoirs. But the series of outages at old coal plants are the biggest risk factor – malfunctions at Pljevlja in Montenegro and Kosovo A have just taken the two facilities offline.

Fires and breakdowns caused blackouts last winter in Serbia and Kosovo* and even impacted the stability of the pan-European transmission network. A significant share of households and companies use inefficient air conditioners and other electric devices for heating, which means power consumption will spike as cold weather sets in.

Coal plants in North Macedonia, Serbia, Montenegro and Kosovo* have proven to be unreliable. The troubles are getting worse as importing electricity is expensive. It is unclear whether state-owned utilities will be able to afford emergency imports in case of sudden shortfalls in domestic output or if there will be any electricity to buy from abroad.

Usual malfunction in Pljevlja

Two nights ago, people living in the town of Pljevlja were woken up by what they said was a loud noise. According to the media, it is the regular sound of the facility shutting down or coming back online.

Officially, government-controlled coal and power utility Elektroprivreda Crne Gore (EPCG) said that what happened was a pipe leak, “a usual malfunction,” and that the coal plant would be repaired by tomorrow morning.

KEK identifying source of crash

The explanation issued by Kosovo Energy Corp. (KEK) for the shutdown of the A3 unit in Kosovo A was even more perplexing. The utility said it is working with transmission system operator KOSTT to “identify the source” of the defect.

The company claimed it secured emergency deliveries to cover the shortage. A3 got back online last week after a recent crash. Rolling blackouts are becoming more frequent in Kosovo*, not least because distribution system operator KEDS lacks funds to purchase electricity elsewhere.

* This designation is without prejudice to positions on status and is in line with UNSCR 1244/99 and the ICJ Opinion on the Kosovo declaration of independence.
Comments (1)
Austen / September 29, 2022

The statement “inefficient air conditioners” needs qualifying: these are air source heat pumps and therefore very energy efficient compared to electric radiators and similar to gas. To me the statement is a mistake

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Serbia drafts just transition action plan public debate

Serbia drafts just transition action plan

30 May 2025 - The Ministry of Mining and Energy has published a draft just transition action plan and launched a public debate

Regional Power Sector Exchange Western Balkans disitribution system operator dso grids ohrid giz

Third Regional Power Sector Exchange in Ohrid: Power grids at core of energy transition

30 May 2025 - The third Regional Power Sector Exchange of the Western Balkans gathered over 80 energy professionals from the Western Balkans

two solar power plants egesa enerji vojvodina

Turkish Egesa Enerji to build two solar power plants in Serbia’s Vojvodina province

30 May 2025 - Turkish company Egesa Enerji has launched a project to build two solar power plants in Vojvodina, with a total nominal capacity of 8.6 MW

Green for Growth Fund partnership Swedish International Development Cooperation Agency Sida

Green for Growth Fund launches partnership with Swedish International Development Cooperation Agency

30 May 2025 - GGF and the Swedish International Development Cooperation Agency are expanding green lending in the Western Balkans and the EU's Eastern Neighborhood