Renewables

Energy Community can integrate 30 GW of renewables without investments in flexibility

Energy Community countries could integrate 30 GW of renewables without investments in flexibility sources

Photo: Didgeman from Pixabay

Published

July 14, 2022

Country

Comments

comments icon

0

Share

Published:

July 14, 2022

Country:

Comments:

comments icon

0

Share

The power systems of the Energy Community contracting parties are capable of connecting 30 GW of variable renewable energy power plants by 2030 without additional investments in flexibility sources, according to its new study.

The Study on Flexibility Options to Support Decarbonization in the Energy Community has assessed the flexibility needs and options until 2030 and 2040 to balance each contracting party’s power system on different time scales (daily, weekly and annual). The evaluation is made under three different scenarios linked to the speed of renewables uptake and level of market integration.

The baseline scenario reflects a business-as-usual development, with relatively slow uptake of renewable energy sources of about 22 GW (9 GW wind, 13 GW solar). The moderate scenario is for 27 GW (12 GW wind, 15 GW solar), and the ambitious plan is for 33 GW (15 GW wind, 18 GW solar), according to the study prepared by consultancies Trinomics and Artelys.

Investments are needed in new flexibility solutions by 2040

The primary existing flexibility sources in contracting parties are coal power plants and cross-border interconnection capacities, with 30 GW and 20 GW, respectively, hydropower plants, with 12 GW, and gas-fired power plants, mostly present in Ukraine with 8 GW.

Any of the analysed scenarios do not need investments in additional flexibility capacities by 2030. However, the study finds that required investments are necessary for new flexibility solutions by 2040.

In the ambitious scenario, EUR 5.7 billion would be needed by 2040. Moreover, electric vehicles (EVs), through smart charging and vehicle-to-grid (V2G), can significantly contribute to flexibility, although investment costs in technologies enabling EV flexibility were not explicitly considered.

In the baseline scenario, investments are not needed to meet the flexibility needs in 2040.

Existing cross-border infrastructure and short-term electricity markets could lower investment needs

Energy Community investments in flexibility sources study

According to the Energy Community Secretariat, investments will be substantially lower if the existing cross-border infrastructure is better utilised and short-term electricity markets are operational and coupled with the European Union.

The study reads that yearly investment needs or costs between 2030 and 2040 into additional flexibility sources will drop by as much as EUR 150 million if day-ahead and intraday markets and balancing markets are coupled between the contracting parties, and the study reads.

The study lists the policy and regulatory recommendations to minimise overall system costs.

Market integration will also allow the absorption of an additional 5 TWh per year of variable renewable production from the EU that would otherwise be curtailed.

The study lists the policy and regulatory recommendations to minimise overall system costs, including energy sector governance, electricity market design, renewable energy development and carbon pricing.

The Secretariat recalled that the contracting parties are recommended to define a flexibility strategy as part of their national energy and climate plans.

Energy Community Secretariat Director Arthur Lorkowski said the study showed nothing should stand in the way of more renewables. “Further electricity market integration is a clear way forward,” he added.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

croatia hydrogen study strategy pilot projects

Croatia has 32 pilot projects in progress for green hydrogen

14 August 2024 - Croatia is in a good position and has key strengths for establishing hydrogen production and use, reads the study commissioned by the Croatian Hydrocarbon Agency

Schletter Group expanding SEE region strengthened takeover from Enstall

Schletter Group expanding in SEE region, strengthened by takeover from Enstall

14 August 2024 - Enstall is acquiring Germany-based solar mounting systems provider Schletter Group, which is spreading its operations in South East Europe

Female Leader in Sustainable Energy

2024 Female Leader in Sustainable Energy award competition announced – apply by September 10

14 August 2024 - Under the auspices of Germany’s international cooperation agency GIZ, the WISE Serbia women's network is launching the 2024 Female Leader in Sustainable Energy contest

Bulgarian gas firms to make green hydrogen mix it into gas grid

Bulgarian gas firms to make green hydrogen, mix it into gas grid

13 August 2024 - The Bulgarian Natural Gas Association (BAPG) is planning a project to produce green hydrogen and mix it into the gas distribution grid