Electricity

Montenegro declares 13 energy projects as infrastructure priorities

Montenegro declares nine energy projects as infrastructure priorities

Foto: anarxi from Pixabay

Published

January 20, 2022

Country

Comments

comments icon

0

Share

Published:

January 20, 2022

Country:

Comments:

comments icon

0

Share

The list of priority infrastructure projects of the Government of Montenegro includes nine energy projects, estimated at EUR 1 billion in total, and 81 in the environmental protection sector, worth an overall EUR 885 million.

The updated list of priority infrastructure projects, introduced in 2018, contains 154 projects with a total value of more than EUR 6.3 billion. Projects also apply to transport, communal infrastructure, education, health, culture, sports, digitalization.

They should be financed by the state budget, state-owned companies, loans, European Union grants, and public-private partnerships. Their strategic importance for the country ranks the projects.

The most important energy project is the Montenegrin part of the Trans-Balkan Corridor

In the energy sector, the most valuable project is the construction of the EUR 271 million HPP Komarnica. Among the new power plants are also the Gvozd wind farm and the Slano dam solar power plant.

The feasibility of the ecological reconstruction of the Pljevlja thermal power plant, with the heating system of the city of Pljevlja, is still discussed. Still, it is on the list of priorities.

The project of the Montenegrin part of the Trans-Balkan Corridor, an investment of EUR 93 million, is the first of all projects in the energy sector in terms of strategic relevance. When it comes to the electricity transmission system, the list also includes the smart grid program of the TSO CGES, and the project for the creation of technical conditions for connection of renewables.

In the distribution network, it is planned to introduce a smart grid and smart metering system worth EUR 35 million.

The Ionian-Adriatic gas pipeline is also one of the priorities

An investment of EUR 109 million is planned to improve energy efficiency in public buildings.

The Ionian-Adriatic Gas Pipeline (IAP) is ranked sixth on the list. It should provide Montenegro with natural gas supplies. Of note, two weeks ago, the state-owned power utility Elektroprivreda Crne Gore (EPCG) announced its plan to build gas power plants.

The following environmental protection projects are on the list:

  • Improvement of water supply – 19 projects
  • Improvement of wastewater management system – 27 projects
  • Waste management – 20 projects
  • Nature protection – 6 projects
  • Flood protection – 8 projects
  • Civil protection – 1 project.
Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

montenegro cges s2p electric grid connection solar tupan prentic asanovic

Swiss S2P Electric signs grid connection deal for solar project in Montenegro

10 March 2026 - The contract represents the eighth such deal for grid connection for renewable energy power plants signed by Montenegro’s TSO CGES

bozinovska interconnections electricity see oecd

Božinovska: Interconnections crucial for Western Balkans energy security

09 March 2026 - North Macedonia is actively working on several key projects for interconnections with electricity systems in the region, said Sanja Božinovska

serbia 2030 plan investments energy dubravka djedovic handanovic

Đedović Handanović: Serbia must start building nuclear power plant before 2035

09 March 2026 - President of Serbia Aleksandar Vučić presented the national strategy Serbia 2030. It is divided into 11 points

croatia sos children village Lekenik solar zez

Children’s first solar village in Croatia rushes toward energy independence

06 March 2026 - SOS Children's Village Lekenik, located between cities of Zagreb and Sisak, has installed a 100 kW solar power plant