Renewables

EU approves Masdar-Taaleri’s 65 MW solar power joint venture in Greece

EU Masdar-Taaleri 65 MW solar joint venture Greece

Succo from Pixabay

Published

July 30, 2021

Country

Comments

comments icon

0

Share

Published:

July 30, 2021

Country:

Comments:

comments icon

0

Share

The European Union’s regulatory branch agreed with the establishment of a firm for the Asopia solar power project in Greece. Masdar, Taaleri, Constantakopoulos and Autohellas are jointly developing the 65 MW photovoltaic facility in Boeotia.

The European Commission has approved the creation of a joint venture based in Greece by Abu Dhabi Future Energy Company PJSC (Masdar) of United Arab Emirates, Taaleri Energia of Finland, Kyoto SA and Autohellas Tourist and Trading, both of Greece. The firm will be active in the development, financing, construction, operation and maintenance of the Asopia solar power plant project.

The decision was made under the European Union’s Merger Regulation. Masdar-Taaleri Generation or MTG is the two companies’ joint venture for Central and Eastern Europe, registered in Serbia. In May they said it would develop the solar power plant with Greek partners Constantakopoulos and Autohellas.

No competition concerns

Asopia, located in Boeotia (also known as Beotia or Viotia) near Athens, is planned to have 65 MW in capacity. Kyoto is Constantakopoulos Group’s real estate and energy arm. Autohellas is active in the markets of car rental, import and trade.

Masdar is officially called Abu Dhabi Future Energy Co. It is wholly owned by Mubadala Investment Co., which is in turn controlled by the UAE’s Emirate of Abu Dhabi. Masdar advances solutions in energy, water, urban development and clean technologies.

The European Commission concluded that the proposed acquisition would raise no competition concerns and said the greenfield joint venture is expected to have limited activities within the European Economic Area.

MTG’s expansion in Greece

Masdar and Taaleri are working on the project separately from the cooperation deal with PPC Renewables, a subsidiary of government-owned Public Power Co. which is tasked with the country’s energy transition activities. Greece vowed to stop using coal by 2025 and replace lignite plants with renewables – mostly photovoltaics.

PPC Renewables inked cooperation agreements in the sector with a string of domestic and foreign companies.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

croatia hydrogen study strategy pilot projects

Croatia has 32 pilot projects in progress for green hydrogen

14 August 2024 - Croatia is in a good position and has key strengths for establishing hydrogen production and use, reads the study commissioned by the Croatian Hydrocarbon Agency

Schletter Group expanding SEE region strengthened takeover from Enstall

Schletter Group expanding in SEE region, strengthened by takeover from Enstall

14 August 2024 - Enstall is acquiring Germany-based solar mounting systems provider Schletter Group, which is spreading its operations in South East Europe

Female Leader in Sustainable Energy

2024 Female Leader in Sustainable Energy award competition announced – apply by September 10

14 August 2024 - Under the auspices of Germany’s international cooperation agency GIZ, the WISE Serbia women's network is launching the 2024 Female Leader in Sustainable Energy contest

Bulgarian gas firms to make green hydrogen mix it into gas grid

Bulgarian gas firms to make green hydrogen, mix it into gas grid

13 August 2024 - The Bulgarian Natural Gas Association (BAPG) is planning a project to produce green hydrogen and mix it into the gas distribution grid