Electricity

Greece tests Peloponnese-Crete link – world’s longest undersea AC cable

Greece tests Peloponnese Crete link world's longest undersea AC cable

Photo: Admie

Published

December 25, 2020

Country

Comments

comments icon

0

Share

Published:

December 25, 2020

Country:

Comments:

comments icon

0

Share

The world’s longest alternating current cable system is functional, as the first power interconnection between Crete and mainland Greece was successfully tested. The link with the Peloponnese peninsula is 174 kilometers long, of which 132 kilometers are on the seabed.

Independent Power Transmission Operator, also known as Admie or IPTO, said the 24-hour test drive of its submarine interconnector between Peloponnese and Crete, the biggest island in Greece, was successful. Italy’s Prysmian laid 132 kilometers of the link under the Sea of Crete. The remainder of the 174 kilometers runs underground on both sides, making it the longest high voltage alternating current (HVAC) cable system in the world.

It is the longest undersea triplex cable interconnection with cross-linked polyethylene (XLPE) insulation, while it has the biggest depth on the planet as well, as much as 1,000 meters, the state-controlled firm said. There are only a handful of longer direct current submarine cables in the world.

European, Greek government funds included in Peloponnese-Crete interconnector project

A second cable, to the west from the first one, is expected to be installed in the first quarter. The overall 150 kV project is worth EUR 356 million. It can cover as much as 34% of the power demand in Crete. Admie secured a twenty-year loan of EUR 178 million from the European Investment Bank in May of last year, while the interconnection is also backed with government funds.

The cable’s capacity will match a third of demand in Crete

The cable connects Megalopolis in central Peloponnese with Heraclion, the biggest city on the island. The subsea portion goes from Chania in Crete to Neapoli Voion.

Cablel and Fulgor laid the underground part and Terna built the substation in the Peloponnese and upgraded the Chania unit. The project spans eight cities.

Greece’s biggest island to be connected to Cyprus

Admie’s Chairman and CEO Manos Manousakis said it is now certain that the “energy blockade of Crete” would be lifted and that the system was switched on two years after the first contracts were signed. The interconnector will help the development of renewables in Greece’s largest island.

Of note, Admie is working on a EUR 1 billion project for an even longer cable, between Crete and the Attica peninsula, via its Ariadne Interconnection subsidiary. It is scheduled to come online in 2023 and boost the capacity to supply the island entirely. Crete is currently dependent on fossil fuel for its electricity.

The EuroAsia Interconnector should link Israel with Europe via Cyprus and Crete.

Admie’s investment plan for the next ten years is worth EUR 4.4 billion. The transmission system operator has just picked Mytilineos for the reconstruction of the Koumoundourou high-voltage center. The project is worth EUR 46 million. The transmission hub will be connected both with Megalopolis and the future Crete-Attica line.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

north macedonia un forum unece sustainable energy bozinovska mickoski

International Forum on Energy for Sustainable Development kicks off in Skopje: reliance on single supplier is risk of past

28 October 2025 - The three-day International Forum on Energy for Sustainable Development gathered more than 500 participants from more than 70 countries

Mingyang presents ultralarge floating twin wind turbine concept

Mingyang presents ultralarge floating twin wind turbine concept

28 October 2025 - Chinese manufacturer Mingyang – Ming Yang Smart Energy is designing a dual floating wind turbine of 50 MW

Annual profits of up to 2.6 million projected for first merchant battery projects in Greece

First merchant battery projects in Greece to be highly profitable, study shows

28 October 2025 - Standalone battery units in Greece are expected to be profitable both in the short and the long term, according to a new study by AUTh

Domac No energy transition without much stronger grid investments

Domac: No energy transition without much stronger grid investments

28 October 2025 - Croatia is investing only half as much in the power network as Slovenia and Austria, head of Croatia's REGEA agency Julije Domac warned