Renewables

Terna hires Tesla, Schneider Electric for its green energy island project

Terna green energy island Tesla Schneider Electric

Photo: Pixabay

Published

October 23, 2020

Country

Comments

0

Share

Published:

October 23, 2020

Country:

Comments:

0

Share

Tesla is supplying batteries for a 1 MW hybrid energy system that Terna Energy won at a tender financed by European funds. The island of Agios Efstratios should cover 85% of its needs for electricity and hot water from renewable energy sources.

Terna Energy is creating a hybrid power and heat production system in small community in the Aegean Sea after offering the best terms at the Ai Stratis Green Island tender. Energypress reported Tesla would provide the battery system. According to the article, Schneider Electric is among the Greek company’s contractors.

Agios Efstratios, which has only 270 inhabitants, will get a wind turbine produced by Enercon, a photovoltaic station, storage and an energy management and monitoring system, the report reveals and adds TEK Thessaloniki is participating. Spyropoulos is said to be responsible for the solar power segment while that Proposis is supplying the digital solutions.

Terna agreed to operate and maintain the green island energy facility

The Centre for Renewable Sources and Energy Saving (CRES) organized the contest. Terna said the remote heating system at the green island, officially called Agios Efstratios, would include central units for heat production and hot water tanks for storage as well as a distribution network.

The firm controlled by GEK Terna agreed to design, procure, install and commission the system to enable an over 85% share of renewable sources in the island’s electricity system. It would make it almost completely energy independent. The contract is also for the operation and maintenance of the hybrid heat and power facility for 12 years.

Deadline is in just over two years

The project’s energy capacity is estimated at 1 MW and the budget is EUR 7.7 million. Terna Energy took on the obligation to construct the green island system within 25 months.

Excess electricity will used to heat water. Locals get power from a diesel-fueled generator and they mostly warm their houses with boilers on heating oil.

The project is financed from the European Union’s structural funds and the cohesion fund. The accompanying studies show generating power and heating energy will become cheaper with the new equipment.

Of note, Agios Efstratios was selected to become the country’s first green island more than ten years ago, but the project has stalled. The original vision includes the introduction of electric vehicles. Ai Stratis is one of the European Union’s Natura 2000 protected areas.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Dubravka Dedovic Djedovic Handanovic reappointed Serbia minister of energy mining

Dubravka Đedović Handanović reappointed as Serbia’s minister of energy, mining

30 April 2024 - Minister of Energy and Mining Dubravka Đedović Handanović is keeping her seat in the new cabinet while Minister of Environmental Protection Irena Vujović is also becoming deputy prime minister

Ensuring robust final NECP updates is vital to EED implementation

Ensuring robust final NECP updates is vital to EED implementation

29 April 2024 - The update of the National Energy and Climate Plans (NECP) is essential to ensure the implementation of the Energy Efficiency Directive starts on the right foot

Slovenia-Energy-Act-bolster-efficiency-decarbonization

Slovenia amends Energy Act to bolster efficiency, decarbonization

25 April 2024 - The changes to Slovenia's Energy Act introduced incentives for renewables, decarbonization of coal regions and energy efficiency measures

Applications for participation in the EUSEW conference are now open

Applications open for EUSEW Policy Conference

23 April 2024 - The 18th European Sustainable Energy Week (EUSEW) will take place from June 11 to 13 in a hybrid format.