Electricity

North Macedonia first EnC member which submitted draft National Energy Climate Plan

north-macedonia-national-energy-climate-plan

Published

October 12, 2020

Country

Comments

0

Share

Published:

October 12, 2020

Country:

Comments:

0

Share

North Macedonia is the first Energy Community Contracting Party to submit its draft National Energy and Climate Plan (NECP) to the Secretariat.

Albania and Georgia have announced that draft chapters of their NECPs have also been submitted to the Secretariat for guidance, while Bosnia and Herzegovina, Kosovo*, Montenegro and Ukraine are still in the process of drafting and aim to submit their plans soon.

Both the EU member states and the Western Balkan countries are preparing NECPs for the first time. NECPs include a set of measures and activities proposed by each member state, targeting the achievement of the EU 2030 energy and climate goals. The NECPs prepared by the countries in the region will have the same composition, but not the same targets because they are not members of the EU.

According to a press release by the Secretariat following the 5th meeting of the Energy and Climate Technical Working Group, it will issue its recommendations to North Macedonia’s draft plan as foreseen by the Ministerial Council before the final submission.

During the meeting, the European Commission provided an overview of the NECP assessment process in the EU.

A study aimed at extending the modelling capacities of the EU to the Energy Community and its nine Contracting Parties for calculating 2030 overall targets will start in November 2020, the Secretariat said.

The Secretariat also announced the launch of a study on energy poverty, which will estimate the number of households in energy poverty in the Contracting Parties and propose policies and measures for addressing it.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

drina-hydropower-plants

Court annuls environmental permit for Drina hydropower project

02 May 2024 - The construction of large hydropower plants on the Drina is facing new delays, after a court ruling to scrap the environmental permit for HPP Foča

el-dorado-electricity-imports-north-macedonia-rke

North Macedonia: ‘Solar El Dorado’ cuts electricity imports to 2.75%

02 May 2024 - In 2023, North Macedonia's new solar capacity increased by as much as 251% compared to 2022

EU-completing-Green-Deal-Industrial-Plan-Net-Zero-Industry-Act

EU completing Green Deal Industrial Plan as Net Zero Industry Act awaits go-ahead

01 May 2024 - The European Union's Net Zero Industry Act is about to come into force, completing legislative work within the Green Deal Industrial Plan

Dubravka Dedovic Djedovic Handanovic reappointed Serbia minister of energy mining

Dubravka Đedović Handanović reappointed as Serbia’s minister of energy, mining

30 April 2024 - Minister of Energy and Mining Dubravka Đedović Handanović is keeping her seat in the new cabinet while Minister of Environmental Protection Irena Vujović is also becoming deputy prime minister