Renewables

EPS gets approval in Serbia for Gornja Drina hydropower project in BiH

EPS Serbia Gornja Drina hydropower BiH

Photo: Pixabay

Published

September 30, 2020

Comments

comments icon

0

Share

Published:

September 30, 2020

Comments:

comments icon

0

Share

Elektroprivreda Srbije (EPS) managed to surpass another obstacle in its plan to construct a hydropower cascade on the upper course of the Drina river in BiH together with domestic utility ERS. The company obtained clearance from Serbia’s competition watchdog amid an environmentalists’ outcry regarding possible damage to nature and habitats.

The Commission for Protection of Competition of Serbia said it gave a green light to state-owned electricity producer Elektroprivreda Srbije or EPS to run a joint venture for the construction of the controversial Gornja Drina hydropower system in Bosnia and Herzegovina. The planned cascade comprises Buk Bijela (93 MW), Foča hydroelectric facility (44 MW) and the Paunci unit, which is envisaged for the capacity of 43 MW.

The project firm established with Elektroprivreda Republike Srpske – ERS for the 180.9 MW project is called Hidroelektroenergetski sistem Gornja Drina and it is based in Foča, in BiH’s southeast near the border with Montenegro.

Environmentalist organizations pushing back against hydropower

Other such projects are in the pipeline in the area, for instance the 35 MW Sutjeska hydropower plant. They have caused an uproar among environmentalists, who are pointing to the potential devastation of nature and habitats and insist there were breaches in the licensing procedure.

Višković: EPS will own 51% of the project firm developing the Gornja Drina hydropower system

The Government of the Republic of Srpska, which controls ERS, bundled the three projects a year ago. Serbia’s EPS is supposed to participate with 51% in the endeavor on the upper course of the Drina, Srpska’s Prime Minister Radovan Višković said recently. He added the request for the approval of the joint venture has been filed with competition authorities in BiH.

Projects are behind schedule

Preparatory works on the Buk Bijela were scheduled for this month and construction is supposed to start in January, while 2023 is targeted for the other two hydropower plants.

ERS got an environmental permit for the largest unit in February after the first one was annulled. In the meantime, environmentalist groups filed a complaint with the Espoo Convention Implementation Committee because Bosnia and Herzegovina didn’t carry out a transboundary environmental impact assessment of the planned dam.

Separately, ERS plans to install three hydropower plants of 45 MW in total on the Bistrica river, a Drina tributary. It has picked China’s AVIC-ENG as the contractor. However, the EUR 120 million project is also lagging.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

macron seos letter lithium

Anti-lithium activists ask Macron for help, Élysée says decision on mining lies with Serbia

29 August 2024 - Serbian environmentalist coalition SEOS has sent a letter to Emmanuel Macron, seeking his support in blocking the lithium mining project

eu critical raw materials law transport environmnet ewd directive

EU’s mining waste rules not fit for new critical raw materials mines

27 August 2024 - The European NGO Transport & Environment commissioned a legal analysis of the 2006 EU Extractive Waste Directive (EWD)

law on energy nuclear power plants

Serbia drafs changes to Law on Energy

22 August 2024 - Public consultations on the draft law on changes and amendments to the Law on Energy will last until September 10

enel texas solar sheep solar grazing

Largest solar grazing agreement: 6,000 sheep to mow grass at eight solar plants

19 August 2024 - The business of using sheep to maintain vegetation is growing quickly. Solar grazing is at the forefront of a booming agrisolar industry