Renewables

Draft energy permit adopted for 48 MW Pakline 2 wind farm

Draft energy permit Pakline 2 wind farm

Photo: Pixabay/Hans

Published

September 21, 2020

Comments

comments icon

0

Share

Published:

September 21, 2020

Comments:

comments icon

0

Share

The Ministry of Energy, Mining and Industry of the Federation of Bosnia and Herzegovina (FBiH) has adopted a draft energy permit for the construction of the Pakline 2 wind farm, with a nameplate capacity of 48 MW and projected annual output of 153.9 GWh of electricity.

The draft energy permit was adopted at the request of the investor, Mostar-based Kamen-Dent, and the ministry announced that interested individuals and legal entities can submit comments and remarks in writing by September 25.

Earlier this month, the ministry adopted draft energy permits for three other proposed wind farms – Baljci, Orlovača, and Ivovik, according to its website.

Baljci will have an installed capacity of 48 MW and projected annual electricity production of 145.7 GWh, while Orlovača’s proposed nameplate capacity is 42.9 MW and its projected annual output 99.6 GWh. Wind farm Ivovik, with an installed capacity of 84 MW, is expected to generate 236.6 GWh of electricity a year.

The investor in the Baljci wind farm is Tomislavgrad-based Tomkup, Orlovača is to be built by HB Wind from Livno, and Ivovik will be developed by Sarajevo-based VE Ivovik.

The Government of FBiH gave the initial consent this year for energy permits for four wind farms, with a total installed capacity of 165.8 MW, including Pakline 2 and Baljci.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Green for Growth Fund financial impact targets 2023

Green for Growth Fund tops its financial, impact targets in 2023

15 July 2024 - The Green for Growth Fund kept mitigating climate change and promoting sustainable economic growth last year in its 18 markets

IRENA La Camera renewables must grow higher speed scale

IRENA’s La Camera: Renewables must grow at higher speed, scale

12 July 2024 - IRENA's Director-General Francesco La Camera warned of ongoing patterns of concentration in geography in renewables deployment as well as against complacency

green steel electric vehicles study transport environment

Switching to green steel would add just EUR 8 per electric vehicle by 2040

11 July 2024 - Switching to 40% green steel would add just EUR 57 to the sticker price of an electric vehicle in 2030, according to an analysis by T&E

Albania declares eight winners at 300 MW solar power auction

Albania declares eight winners at 300 MW solar power auction

10 July 2024 - The lowest bid at Albania's solar power auction came in at EUR 39.7 per MWh, against a starting level of EUR 59.97 per MWh