Renewables

Biggest Croatian PV plant inaugurated on Vis island

Biggest Croatian PV plant Vis island

Photo: HEP Group

Published

September 11, 2020

Country

Comments

comments icon

0

Share

Published:

September 11, 2020

Country:

Comments:

comments icon

0

Share

One of the most remote islands in the Adriatic became self-sustainable in energy terms. Croatian HEP Group’s PV plant in Vis started regular operations today, and with its 3.5 MW and a battery of 1 MW it is the biggest of its kind in the country.

State-controlled energy company Hrvatska elektroprivreda (HEP Group) ended the trial run of a 3.5 MW solar power facility and marked the beginning of regular operations. The biggest Croatian photovoltaic – PV plant, located on Vis, features a 1 MW battery tank, the first of its kind in the country. It has a maximum output of 1.44 MWh.

The addition to the electric power system is part of the sustainable development agenda and it makes the island very sustainable, said Split-Dalmatia County’s Deputy Governor Ante Šošić. “Islands lost the most people. These are the kind of the projects that we need,” he told N1.

The local official said the photovoltaic plant in Vrlika, in the same county, would be twice as big. Its first phase, 2.1 MW, is scheduled to be finished this year.

Investment worth EUR 4.15 million

The system in Vis consists of 11,200 modules of 340 W. It is worth EUR 4.15 million. HEP earmarked EUR 2 billion for new capacity by 2030, of which one half is for renewables.

Vis earlier tackled the water supply issue by tapping wells on the island

Engineers from Končar installed the solar power plant ahead of schedule. It includes five converters with a nominal power of 720 kW each and a SCADA management system. The cable network is 5.2 kilometers long. Fractal from Split was responsible for supervision.

The biggest Croatian PV unit, which will sell electricity without subsidies, boosted the remote Adriatic island’s self-sustainability as it already secured its own water supply from local wells. Vis is connected via an undersea power link with Hvar island.

Estimated annual production matches demand from households on island

The unintegrated solar power plant is designed for an annual output of 5 GWh, which matches the electricity consumption of 1,600 local households, HEP Group said. The local authority participated in the project.

The energy storage system will be especially helpful outside of the tourist season. The island has 3,600 inhabitants, but there are several times more people there in the summer.

HEP installed Sunčana elektrana Vis on 5.7 hectares at Griževa glavica near the village of Žena Glava. It is located 3.6 kilometers southwest from the town of Vis and 4.8 kilometers east from Komiža, which is slightly smaller.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Green for Growth Fund financial impact targets 2023

Green for Growth Fund tops its financial, impact targets in 2023

15 July 2024 - The Green for Growth Fund kept mitigating climate change and promoting sustainable economic growth last year in its 18 markets

IRENA La Camera renewables must grow higher speed scale

IRENA’s La Camera: Renewables must grow at higher speed, scale

12 July 2024 - IRENA's Director-General Francesco La Camera warned of ongoing patterns of concentration in geography in renewables deployment as well as against complacency

green steel electric vehicles study transport environment

Switching to green steel would add just EUR 8 per electric vehicle by 2040

11 July 2024 - Switching to 40% green steel would add just EUR 57 to the sticker price of an electric vehicle in 2030, according to an analysis by T&E

Albania declares eight winners at 300 MW solar power auction

Albania declares eight winners at 300 MW solar power auction

10 July 2024 - The lowest bid at Albania's solar power auction came in at EUR 39.7 per MWh, against a starting level of EUR 59.97 per MWh