Renewables

450 MW offshore wind park to be built in Adriatic Sea

Saipem offshore wind farm Adriatic Sea

Photo: Saipem

Published

August 26, 2020

Country

Comments

comments icon

0

Share

Published:

August 26, 2020

Country:

Comments:

comments icon

0

Share

Italy-based energy services company Saipem has announced plans to build one of the first wind farms in the Adriatic Sea in cooperation with two other domestic firms. The offshore wind power plant, described as the biggest in Italy, will have an installed capacity of about 450 MW.

Saipem said the planned wind farm will have 56 turbines on foundations fixed on the seabed at two different sites near the Italian port city of Ravenna. One is over 8 nautical miles and the other some 12 nautical miles from the shore.

The project will also involve floating solar technology and the production of green hydrogen

The project will involve floating solar technology and the production of green hydrogen, Saipem said. One of the partners on the project is AGNES, which develops offshore and nearshore wind farms, floating solar panels, and energy storage systems. It produces renewable hydrogen as well.

The other partner is QINT’X, which specializes in solar, wind and hydroelectric energy as well as e-mobility (electric vehicles). According to the QINT’X website, the wind farm is expected to launch operations within the next three years. The three companies have recently signed a memorandum of understanding on the project.

Saipem plans to develop floating wind farms in Saudi Arabia, Sicily, Sardinia

This undertaking is in line with Saipem’s new business model introduced in 2019 as part of an agreement with German renewable energy company Plambeck to develop wind farms with floating foundations in the Red Sea off the coast of Saudi Arabia.

Through its XSIGHT division, Saipem is planning to launch similar projects in Sicily and Sardinia as well, using floating foundations for wind turbines, said Mauro Piasere, XSIGHT’s chief operating officer.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

geothermal well croatia

Croatia confirms major geothermal resource for district heating

30 June 2025 - The tested geothermal well could meet nearly 60% of district heating needs in Velika Gorica, the Croatian Hydrocarbon Agency says.

Montenegro NECP public consultation sole coal plant shutdown 2041

Montenegro publishes NECP for public consultation – sole coal plant planned for shutdown in 2041

30 June 2025 - The retirement of the Pljevlja coal plant is planned for 2041, but it depends on a just transition and supply security, the draft NECP reads

hydrogen natural gas pipeline

Serbia plans hydrogen transport through gas pipelines

30 June 2025 - Gas transmission system operator Transportgas has invited bids for producing a study on hydrogen transport through the gas network

LONGi ignites Romania energy transition 54 1 MW BC

LONGi ignites Romania’s energy transition with 54.1 MW BC technology triumph

30 June 2025 - A PV plant in Romania's northwest is on schedule for a grid connection in the fourth quarter. It features LONGi Solar's BC modules.