Renewables

Final turbine installed at Europe’s biggest onshore wind complex Fosen

Europe's biggest wind farm project Fosen

Photo: Statkraft

Published

August 20, 2020

Country

Comments

comments icon

0

Share

Published:

August 20, 2020

Country:

Comments:

comments icon

0

Share

The 1.06 GW Fosen complex in central Norway, Europe’s largest onshore wind power project, has seen its final turbine installed. The last of the 277 turbines supplied by Vestas was erected at the sub-project Geitfjellet, Recharge has reported, quoting the project’s majority owner, Norwegian state-controlled power utility Statkraft.

Statkraft CEO Christian Rynning-Tønnesen has recently said that the company was about to complete the Fosen wind power complex, whose construction began in 2016. According to the Recharge report, before the turbines can be put into regular operation, the developers now have to carry out extensive testing and clean-up and zoning work.

Statkraft, the largest renewable energy producer in Europe, has a 52.1% stake in the Fosen project, while 40% is in the hands of Nordic Wind Power, a consortium led by Credit Suisse Infrastructure Partners. The rest is owned by local power utility TrønderEnergi.

The project comprises six wind farms, which will together produce 3.6 TWh of renewable energy per year, according to Statkraft.

Reindeer herders protested against the Fosen project claiming it would ruin their way of life

During the development of the project, Statkraft and its partners faced obstacles such as heavy snow and the COVID-19 pandemic, but also protests by the local community of reindeer herders, who claimed that some of the turbines destroyed pastures and could ruin their traditional way of life. This claim, however, was rejected by the investors.

Fosen may face unprofitability due to record-low power prices

According to Recharge, another problem facing the investors is a plunge of electricity prices in the Nordic market, which could undermine the project’s profitability.

However, while acknowledging that the prices dropped by as much as 84% to €5.60/MWh in the second quarter due to large snow-melting and full hydro reservoirs, Rynning-Tønnesen said a strong recovery is expected, with prices likely rising to about €25/MWh in 2021.

Statkraft produces hydropower, wind power, solar power, and gas-fired power, and supplies district heating, employing 4,000 people in 17 countries, according to its website.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

ContourGlobal 500 MWh standalone BESS facility in Bulgaria

ContourGlobal installs 500 MWh standalone BESS facility in Bulgaria

09 January 2026 - ContourGlobal inaugurated a standalone battery energy storage system of 202 MW. It is participating in Bulgaria’s day-ahead and intraday electricity markets.

Semi-transparent solar systems lose cost-competitiveness above 50% transparency

Semi-transparent solar systems not cost-efficient if transparency is above 50%

08 January 2026 - Transparency of over 50% in semi-transparent solar modules significantly reduces system efficiency per unit area, which directly increases electricity generation costs

agricultural land romania renewable energy

Romania plans to lease unproductive land for renewable energy projects

08 January 2026 - Romania is drafting legislation that would enable awarding concessions on unproductive and degraded agricultural land for renewable energy plants

Kelag International RES Project - WPP Jasenice and SPP Bukovica near Zadar, Croatia

Kelag International strengthens European presence with brand unification

08 January 2026 - Kelag International has unified its subsidiaries under its single brand, saying it is strengthening the group’s European identity