Renewables

E.ON installs rooftop photovoltaic unit in TeraPlast Industrial Park in Bistrița

Teraplast-Romania-solar-photovoltaic-eon

Photo: Teraplast

Published

August 18, 2020

Country

Comments

comments icon

0

Share

Published:

August 18, 2020

Country:

Comments:

comments icon

0

Share

TeraPlast put into operation the first solar power unit installed by the subsidiary of German E.ON in Romania. The panels on the manufacturer’s production halls and buildings will satisfy 11% of its electricity demand and the construction of two more photovoltaic facilities is underway.

E.ON Energie România said it completed the construction of one of the largest roof-mounted photovoltaic power generation systems in the country, within the partnership concluded with the Bistrița-based company TeraPlast. The investment was worth EUR 1.9 million.

More than seven thousand modules were installed on production halls and buildings together with 30 inverters and 55,000 meters of cables. The solar power plant in TeraPlast Industrial Park meets 11% of the consumption of the PVC plastics producer and processor, translating to carbon dioxide savings of 660 tons per year, according to the announcement.

The energy services provider headquartered in Târgu Mureș operates within German E.ON’s subsidiary in Romania.

TeraPlast boosting sustainability

Chief Executive Officer of TeraPlast Alexandru Stânean said the earlier investment in its recycling operations enabled the reduction of the carbon footprint by 16,000 tons per year and that the photovoltaic facility built by E.ON is a step in its strategy to increase sustainability. “If just 30% of companies that own industrial halls adopt this model, our country would become a net exporter of energy,” he added.

Stânean: If just 30% of companies with industrial halls installs photovoltaic units, Romania would become a net exporter of energy

The unit located in the north of Transilvania has a maximum direct current capacity of 1.94 MW and 1.6 MW in alternating current. It includes a remote monitoring system.

The strategic partnership was established in 2018 with the option to extend its scope by another EUR 4 million. At the time, the solar power plant’s annual output was projected at 2.2 GWh.

E.ON leans on turnkey solutions

E.ON is already implementing another photovoltaic project with TeraPlast in Bistrița and one more in Băicoi, in central Romania. Last month it announced a deal with tissue paper producer Don Pedro for a turnkey rooftop solar facility of 615 kW in Vâlcea county. The investment is worth EUR 630,000.

Also in July, E.ON launched a service in three Romanian regions for household customers who wish to become prosumers. The company said it would install and maintain solar panels, charge fixed rates and buy excess electricity.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Green for Growth Fund financial impact targets 2023

Green for Growth Fund tops its financial, impact targets in 2023

15 July 2024 - The Green for Growth Fund kept mitigating climate change and promoting sustainable economic growth last year in its 18 markets

IRENA La Camera renewables must grow higher speed scale

IRENA’s La Camera: Renewables must grow at higher speed, scale

12 July 2024 - IRENA's Director-General Francesco La Camera warned of ongoing patterns of concentration in geography in renewables deployment as well as against complacency

green steel electric vehicles study transport environment

Switching to green steel would add just EUR 8 per electric vehicle by 2040

11 July 2024 - Switching to 40% green steel would add just EUR 57 to the sticker price of an electric vehicle in 2030, according to an analysis by T&E

Albania declares eight winners at 300 MW solar power auction

Albania declares eight winners at 300 MW solar power auction

10 July 2024 - The lowest bid at Albania's solar power auction came in at EUR 39.7 per MWh, against a starting level of EUR 59.97 per MWh