News

Share of renewables in buildings to reach two thirds

Published

October 29, 2015

Comments

comments icon

0

Share

Published:

October 29, 2015

Comments:

comments icon

0

Share

To reach the target of reduction in energy consumption of 15% by 2020 and 30% by 2030, compared to 2005 levels, overall investments in buildings should be EUR 350–450 million a year or EUR 6.7 billion in total, according to the strategy adopted by the Government of Slovenia, STA said. The document forsees that homeowners will cover three quarters of the outlays, while the private services and public sector will contribute 15% and 10% of the funds, respectively, The Slovenia Times reported.

At least two-thirds of energy used by buildings should come from renewable sources. Emissions of carbon dioxide attributed to buildings would be reduced by 60% by 2020 and 70% by 2030, the article said. This will require insulating and retrofitting between 1.3 and 1.7 million square metres of buildings each year. These are just intermediate targets on the way to the ultimate objective of achieving zero carbon emissions from buildings by 2050, the article said.

Related Articles

Siemens Energy to replace transformers at Romania's largest hydropower plant Iron Gate 1

Siemens Energy to replace transformers at Romania’s largest hydropower plant

01 April 2026 - Hidroelectrica picked Siemens Energy to supply seven transformers within the modernization of the Iron Gate 1 hydropower plant on the Danube

Brent oil on track for highest ever monthly jump in March

Brent oil on track for highest-ever monthly jump in March

31 March 2026 - The Middle East war shook the oil market, with the benchmark Brent crude oil price spiking more than 55% since the end of February

north macedonia energy renovation public buildings afd giz bozinovska

North Macedonia to invest EUR 50 million in energy renovation of public buildings

31 March 2026 - The Ministry of Energy, Mining and Mineral Resources started preparations for investments in the energy renovation of public buildings

How to choose a BESS integrator for utility-scale solar projects

31 March 2026 - Solar developers need to consider four main factors when selecting the integrator for a battery energy storage system (BESS)