Renewables

Albania, North Macedonia, Serbia, Slovenia, Kosovo* still short on 2020 renewable energy targets

Photo: Pixabay

Published

January 24, 2020

Country

Comments

comments icon

0

Share

Published:

January 24, 2020

Country:

Comments:

comments icon

0

Share

Five countries from the region – Albania, North Macedonia, Serbia, Slovenia, and Kosovo* – have not yet reached their 2020 renewable energy targets. Greece managed to get to its threshold, according to the latest Eurostat data, for 2018.

Bulgaria, Croatia, Montenegro and Romania reached in 2015 their national targets for the share of renewable energy in gross final energy consumption by 2020.

In 2018 Greece joined the group. With 18%, it matches its target.

Renewables’ share in the European Union was 18%, half of a percentage point more than in 2017. It compares to the 2020 target of 20%.

Serbia has the longest road ahead while Kosovo* needs just one small step

Among the five countries that haven’t reached their national targets, Serbia has the longest road ahead, while  Kosovo* needs just one more step.

Serbia is lagging behind its 27% target, as its compliance is 20.3%. But Kosovo* is consuming 24.9% of its energy from renewables, against the 25% target. The issue with Serbia is also that the country’s renewable energy share in consumption is decreasing from 2015.

Share of energy from renewable sources (in % of gross final energy consumption); *Data estimated

Albania needs 3.1 points to hit the 38% objective and North Macedonia is 4.9 points short of the 23% goal. Slovenia also must speed up the renewables’ uptake because at 21.1% it is lagging behind its 25% target.

The share of renewable energy consumption in Turkey reached 13.7%, but the country doesn’t have a 2020 target.

Montenegro is again the regional leader with 38.8%, but its share of renewables is decreasing

Montenegro is again the regional leader with 38.8%, though its share of renewables in consumption is on a downward trend. In 2014, the level was 44.1%.

The latest Eurostat report does not have data for Bosnia and Herzegovina.

* This designation is without prejudice to positions on status and is in line with UNSCR 1244/99 and the ICJ Opinion on the Kosovo declaration of independence.
Tags:
Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

barcelona spain solar capacity 50 GW

Spain’s solar power capacity tops 50 GW

13 February 2026 - Spain’s total solar capacity currently stands at around 50.2 GW, or 34% of the overall electricity generation capacity, according to REE

serbia electricity market rules ems nikola tosic balancing

Serbia’s new electricity market rules bring important changes

12 February 2026 - Nikola Tošić, Market Division Manager at Serbia's transmission system operator EMS, explains new electricity market rules

YESS Power integrates battery system with Novaci PV plant in North Macedonia

YESS Power integrates battery system with Novaci PV plant in North Macedonia

12 February 2026 - Turkey-based YESS Power has commissioned, as a contractor, the first grid-scale BESS in North Macedonia and the region

romania ppc bess battery salbatica wind farm

PPC to install 60 MWh battery system at Sălbatica wind farm

11 February 2026 - PPC operates the Sălbatica 1 and Sălbatica 2 wind farms, with a combined capacity of 140 MW, located in Tulcea County