Electricity

Six power utility EPS employees arrested over mini HPP Dubočica 2

Photo: Dubočica (Facebook/Odbranimo reke Stare planine)

Published

August 13, 2019

Country

Comments

comments icon

0

Share

Published:

August 13, 2019

Country:

Comments:

comments icon

0

Share

Police have arrested six employees at Serbia’s state power utility Elektroprivreda Srbije (EPS) in Kraljevo on suspicion of office abuse related to the construction of a power facility for the Dubočica 2 mini hydropower plant (HPP), EPS said in a press release.

The suspects arrested on office abuse charges concerning the Dubočica 2 mini hydropower plant have been identified as Zoran Pantelić, Grujica Davidović, Dejan Radić, Milan Vučković, Dragan Mačužić, and Saša Dimić, all holding management posts in the Kraljevo unit of EPS.

They are suspected of having unlawfully used EPS’ employees and machinery in 2016 and 2017 to build a power facility for Dubočica 2

They are suspected of having unlawfully used EPS’ employees and machinery in 2016 and 2017 to build a power facility for Dubočica 2, owned by Milan Vučković, i.e. his firm Hidroenergo Dubočica. By doing so, they caused RSD 1.96 million (less than EUR 17,000) in damage to EPS, enabling Hidroenergo Dubočica to earn an equal value of illicit gains, according to the press release.

Arrests over mini HPP Dubočica made last month

In mid-July, police arrested five employees at distribution system operator EPS Distribucija in Kraljevo on suspicion of office abuse and causing RSD 2.4 million (over EUR 20,000) in damage to EPS.

Those arrested are suspected of having illegally enabled connecting Dubočica to the distribution network, earning RSD 2.4 million in illicit gains and causing damage to EPS in the same amount, EPS said at the time.

Residents opposed to run-of-river small hydropower plants

Citizens across the Balkans have been protesting the construction of run-of-river small hydropower plants for two years now.

The local residents say that the plants’ construction would make hard lives in remote areas even harder, experts say that run-of-river SHPPs destroy ecosystems and biodiversity, and civil society organizations are going a step further, providing arguments why solar, for example, should be incentivized instead of small hydropower plants to avoid a backlash against all renewables.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

serbia eps biomass biogas biomethane coal power plants

Serbia’s EPS explores possibility to use biomass, biogas in coal power plants

27 December 2024 - EPS launched a call for an analysis of the availability and technological suitability of biomass in Serbia for use in its power plants

Slovenia adopts updated Integrated National Energy and Climate Plan

Slovenia adopts updated Integrated National Energy and Climate Plan

27 December 2024 - Slovenia targets 400 MW in BESS, 100 MW in electrolyzers and more pumped storage in the updated Integrated National Energy and Climate Plan

croatia grid investments hops

Croatia’s TSO HOPS to get EUR 100 million to upgrade grid

26 December 2024 - The funds are secured from the country's National Recovery and Resilience Plan for the period 2021-2026

eso transmission grant greenabler

Bulgaria signs EUR 166 million in grants to boost grid for renewables

26 December 2024 - The first group of investments under the Greenabler project is worth EUR 568 million and is planned for financing from the EU's Modernisation Fund.