Waste

Public debate on Belgrade’s waste incinerator, new landfill to be held on July 23

public debate

Photo: Vinča landfill (Beo Čista Energija)

Published

July 12, 2019

Country

Comments

comments icon

0

Share

Published:

July 12, 2019

Country:

Comments:

comments icon

0

Share

A public debate on two environmental impact assessments (EIA) for a project to build a waste-to-energy facility and a new landfill at the Belgrade suburb of Vinča, prepared by Beo Čista Energija, will be held on July 23 on the premises of the municipal administration of Grocka.

The Ministry of Environmental Protection has announced that Beo Čista Energija has submitted the environmental impact assessments for the project to build the Vinča waste-to-energy facility, which would incinerate municipal waste and use landfill gas, and for the project to build a new landfill in Vinča.

The EIAs can be examined by July 18 in the Ministry’s office, on 1 Omladinskih Brigada St., as well as in the office of the Grocka municipal administration and on the Ministry’s website.

On July 23, starting at 10 am, the public debate and a presentation of the EIAs will be held in the offices of the Grocka municipal administration, the Ministry said on its website.

According to the EIA for the project to build the Vinča waste-to-energy facility, the facility will be built at the existing Vinča landfill, with the direct incineration of municipal waste envisaged.

The preparation of EIAs has been controversial. In January, following a complaint filed by the Ne Davimo Beograd initiative, the Government of Serbia annulled the Ministry’s decision determining the scope and contents of the EIA for the project to build the waste incinerator.

Marguerite Waste Serbia new shareholder

Beo Čista Energija is a joint venture between France’s Suez Groupe, I-Environment Investments, a subsidiary of Japan’s Itochu, and Luxembourg-based Marguerite Waste Serbia. Originally, Suez Groupe and I-Environment Investments held 50% each, but they later sold 10% each to Marguerite Waste Serbia.

In September 2017, the City of Belgrade and the Suez-Itochu consortium signed an agreement on a 25-year public-private partnership (PPP) for the closure and remediation of the Vinča landfill and the construction of a waste-to-energy cogeneration facility to produce heat and electricity.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

green steel electric vehicles study transport environment

Switching to green steel would add just EUR 8 per electric vehicle by 2040

11 July 2024 - Switching to 40% green steel would add just EUR 57 to the sticker price of an electric vehicle in 2030, according to an analysis by T&E

vinca beo cista energija waste to energy facility

Beo Čista Energija officially starts producing energy from waste at Vinča landfill in Belgrade

03 July 2024 - Beo Čista Energija started the waste incineration in February 2023 as a final phase of testing its waste-to-energy facility

co2 is co2 zero waste europe calls for including incineration in eu ets

CO2 is CO2: Zero Waste Europe calls for including incineration in EU ETS

25 June 2024 - Incinerators are poised to become the most carbon-intensive power source once coal is phased out, claims Zero Waste Europe

French firms to build, operate Belgrade’s first wastewater plant

French firms to build, operate Belgrade’s first wastewater plant

24 June 2024 - The large-scale wastewater plant in Veliko Selo would help preserve the water quality and biodiversity of the Danube and Sava rivers