Renewables

FEIT 1st university school in Macedonia to install rooftop PV systems

Photo: Facebook/FEIT

Published

August 23, 2018

Country

Comments

comments icon

0

Share

Published:

August 23, 2018

Country:

Comments:

comments icon

0

Share

The Ss. Cyril and Methodius University of Skopje’s Faculty of Electrical Engineering and Information Technologies (FEIT) is the first university school in Macedonia to have launched electricity production for self-consumption using rooftop photovoltaic (PV) systems, according to a statement from the FEIT.

Though small, the EUR 27,500 investment in the two rooftop PV systems sends a positive signal to other university schools and state institutions, given that it will cut the FEIT’s annual electricity bills by between EUR 3,000 and EUR 3,500, thereby reducing the burden on the state budget, but also help fight air pollution in what is one of Europe’s most polluted cities.

One of the PV systems, with a capacity of 10 KW, was donated by Macedonia’s largest fuel retailer OKTA, part of Greece’s Hellenic Petroleum, as of recently also active in the production of electricity from renewable energy sources.

The other PV system, which has a capacity of 12 KW and an energy storage system, was procured as part of the EU’s Instrument for Pre-Accession Assistance (IPA) project Enhancing Storage Integration in Buildings with Photovoltaics – PV ESTIA and from the FEIT’s own sources, said FEIT Dean Dimitar Taškovski.

The FEIT’s project should serve as an example to other educational institutions to exploit the potentials of renewable energy sources, said Macedonian Minister of Education and Science Arber Ademi, noting that the PV systems will also enable the FEIT’s students to gain hands-on experience and practical knowledge of how these energy facilities work.

Households invited to take part in pilot project

Earlier, the FEIT invited households to express interest by September 1 in participating in a pilot project within the framework of PV ESTIA, during which the consumption of electricity will be measured at 20 households.

By the end of September 2018, a measuring device will be installed in each of the selected households to measure the consumption of electricity for three years. During this period, the households will have an opportunity to monitor their consumption on a wireless home monitor in real time or through an app (on a computer, tablet, or smartphone).

The measured data acquired in this way will be owned by the project and will be used to form a clear representation of the habits of household electricity consumption by analyzing the corresponding consumer diagram, the FEIT said.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Romania green energ system hospitals private partner

Romania to green energy system in hospitals with private partner

26 July 2024 - Romania is in talks with Abu Dhabi–based IHC on a public-private partnership worth EUR 1 billion for heat pumps and PV systems for hospitals

serbia energy strategy 2040

Serbia publishes Draft Energy Sector Development Strategy up to 2040

25 July 2024 - Thermal power capacity is seen decreasing by 45% and the capacity of renewable energy facilities is expected to increase by 20 times

Serbia Integrated National Energy and Climate Plan until 2030

Serbia adopts Integrated National Energy and Climate Plan until 2030

25 July 2024 - Serbia has aligned itself with Europe's vision, Minister Đedović Handanović said upon the adoption of the Integrated National Energy and Climate Plan

Bucharest introduce geothermal district heating

Bucharest to introduce geothermal district heating

25 July 2024 - Electrocentrale Bucharest (ELCEN) and Sage Geosystems are launching a study on using geothermal energy in district heating in Romania's capital city