News

Albanian court upholds annulment of HPP projects

Albanian court upholds annulment of HPP projects

Photo: Pixabay

Published

August 1, 2018

Country

Comments

comments icon

0

Share

Published:

August 1, 2018

Country:

Comments:

comments icon

0

Share

The first-instance Administrative Court in Tirana has upheld the Ministry of Infrastructure and Energy’s decision to scrap HP Bigas dhe Veleshnje Energy’s projects to build two HPPs in Albania’s grand Osumi Canyon, a major tourist and rafting attraction. The Albanian investor had contested the ministry’s decision to partially annul a contract on the investment before the court.

According to the Albanian media, the projects to build the Bigas 1, Bigas 2, and Veleshnje hydropower plants (HPP) are steeped in controversy, and not only over what would be their environmental impact.

The contract was first signed in 2013, in the last days of the previous government. The projects were later confirmed in an amended form by the authorities, but the administration of Prime Minister Edi Rama eventually annulled them amid a public outcry fueled by the objections of locals, civil society organizations (CSO), and sports groups doing rafting on the Osumi River, according to reports.

HPPs in protected areas and national parks in Albania have been a highly contested issue in recent years, following the construction of HPPs on the Valbona River and plans for the construction of the Kalivac HPP on the Vjosa River, Invest in Albania recalled. Earlier this year, Albania won arbitration proceedings over HPP Kalivac against Italy’s Hydro S.R.L.

A total of 14 HPPs are proposed to be built on the Valbona River, with three already under construction. A number of environmentalists and CSOs have joined forces to campaign against the HPP construction plans.

Environmental CSOs have recently stepped up campaigning against hydropower projects in the Balkans.

According to a recent study by Bankwatch, one of the largest networks of environmental CSOs in Central and Eastern Europe, South-East Europe’s (SEE) wild rivers are being destroyed by a wave of hydropower projects. The study investigated the situation in Albania, Bosnia and Herzegovina, Bulgaria, Croatia, Kosovo*, Macedonia, Montenegro, Serbia, and Slovenia.

* This designation is without prejudice to positions on status and is in line with UNSCR 1244/99 and the ICJ Opinion on the Kosovo declaration of independence.
Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Petrol obtains financing EV charging network Slovenia Croatia

Petrol obtains financing for EV charging network in Slovenia, Croatia

15 July 2024 - Slovenia-based Petrol is about to install electric vehicle charging points in 35 locations in its home market and in Croatia.

Green for Growth Fund financial impact targets 2023

Green for Growth Fund tops its financial, impact targets in 2023

15 July 2024 - The Green for Growth Fund kept mitigating climate change and promoting sustainable economic growth last year in its 18 markets

Energy permit not needed for power plants under 1 MW in BiH

15 July 2024 - The Ministry of Energy, Mining and Industry has adopted the rulebook on issuing energy permits and it entered into force on July 6

koncar croatia siemens energy

Končar, Siemens Energy launch new joint venture

15 July 2024 - Croatia’s firm Končar and Siemens Energy have signed a joint venture agreement on the establishment of the Končar - Transformer Tanks