Renewables

Wind farm quota not to be raised, investors to be selected in tenders – PM

Photo: twitter/SerbianPM

Published

June 6, 2018

Country

Comments

comments icon

0

Share

Published:

June 6, 2018

Country:

Comments:

comments icon

0

Share

Serbian Prime Minister Ana Brnabić has said that feed-in quotas for electricity produced by wind farms will not be increased over the coming period, noting that the construction of new wind farms will primarily depend on bids in tenders.

Asked whether wind farm projects, which are focused on Serbia’s northern province of Vojvodina, will also be built in the Timočka Krajina region, given that the area has attracted interest, Brnabić said that the energy law envisages wind feed-in tariffs for a quota of 500 MW of installed wind capacity, noting that the ongoing projects have for the most part filled the quota, Tanjug reported.

She added that the matter will be discussed with the Ministry of Mining and Energy.

“The trend in Europe is not to increase quotas – the trend is to organize tenders and award projects to those who offer the lowest prices,” Brnabić said.

This means that new wind farms could be built depending on investors’ offers, she said, noting that she does not believe the quota will be increased, given that Serbia is following the EU trends concerning the matter.

“I think that the one who offers the lowest price will be able to build wind farms,” Brnabić was quoted as saying.

The existing renewables incentive model expires at end-2018

The decree on incentives for the production of electricity from renewable energy sources and by cogeneration facilities, which envisages subsidies in the form of feed-in tariffs for wind farms, but also other facilities producing energy from renewable energy sources (RES), expires at the end of the year.

Last year, the Energy Community proposed to Serbia to introduce a system of RES incentives that would be based more on market principles, such as auctions and tenders, as well as to abolish feed-in tariffs. However, some believe that changing the existing RES subsidy system is not in Serbia’s interest.

The Ministry of Mining and Energy is working on a new legal framework, and Miloš Banjac, assistant energy minister for RES and energy efficiency, has said that the feed-in tariff model of incentives for renewable energy production is obsolete, noting that the next step will be the introduction of feed-in premiums and auctions.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

montenegro gvozd epcg nordex agreement

Montenegro’s power utility EPCG begins construction of Gvozd wind farm

21 November 2024 - Wind farm Gvozd will be the first large-scale power generation facility to be built by EPCG in more than 40 years

Bulgarian waterworks firm installs in pipe hydropower generator

Bulgarian waterworks firm installs in-pipe hydropower generator

21 November 2024 - A waterworks and sewerage firm in Bulgaria produces electricity using an in-pipe hydropower device in a supply line

montenegro france afd loan spajic vukovic

Montenegro signs EUR 50 million loan agreement with France’s AFD

20 November 2024 - AFD will support Montenegro's reforms in waste management, renewable energy, sustainable forestry, and climate action

district heating decarbonization Wärtsilä chp engines heat power

District heating delivers affordable, flexible decarbonized energy – study

20 November 2024 - The authors have analyzed various revenue streams for combined heat and power generation, particularly combined heat and power engines