Renewables

Third big solar power project without subsidies enters pipeline in Albania

Third big solar power project without subsidies Albania

Photo: Samuel Faber from Pixabay

Published

June 4, 2021

Country

Comments

comments icon

0

Share

Published:

June 4, 2021

Country:

Comments:

comments icon

0

Share

The Ministry of Infrastructure and Energy of Albania accepted the application by Info-Telecom for a 50 MW solar power plant in Fier, the third such project of the same size in the same municipality. The photovoltaic facility won’t be eligible for any kind of government support.

The solar power market in Albania is in expansion, mostly due to renewable energy auctions, but legal reforms and a rapid drop in equipment costs over the past decade enabled the emergence of another segment. The Ministry of Infrastructure and Energy announced that it accepted the application from telecommunications operator Info-Telecom, which intends to build a photovoltaic system of 50 MW on a fully commercial basis.

It is the third such project under development in the Fier municipality in the country’s southwest and they are all planned to be of the same size. The ministry issued installation licenses more than two months ago for two solar power plants of 50 MW each, called Blue 1 and Blue 2, to domestic firms Blessed Investment and Matrix Konstruksion.

The projects are not subject to concession agreements or to subsidies and their output will be sold on the market. However, Blue 1 and 2 are obligated to pay royalty proceeds to the ministry in electricity or money equal to 2% of annual production.

The site for the project that Info-Telecom is developing is in Libofshë, between the city of Fier and the Divjakë-Karavasta National Park, where Voltalia is about to build its 140 MW Karavasta solar power plant. The voice carrier serves private clients in Albania and Kosovo*.

* This designation is without prejudice to positions on status and is in line with UNSCR 1244/99 and the ICJ Opinion on the Kosovo declaration of independence.
Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

serbia solar wind 2025 projections

Serbia to add 138 MW in solar, wind in 2025

21 February 2025 - The estimated capacity of prosumers is 123.6 MW, out of which 43 MW would be new photovoltaics, according to the energy balance

Energy industry confidence in net-zero goals sinks EIC report

Energy industry confidence in net zero goals sinks – report

21 February 2025 - Energy industry confidence in reaching net zero targets is fading, according to Net Zero Jeopardy Report II by the Energy Industries Council

EU renewables role Vision for Agriculture and Food

EU acknowledges renewables role in Vision for Agriculture and Food

21 February 2025 - Green energy and energy communities are beneficial for farmers, the European Commission said in its Vision for Agriculture and Food

Kosovo four applications wind power auction

Kosovo* receives four applications for wind power auction

21 February 2025 - German, Kosovar, French and Turkish companies submitted documentation to qualify for the first wind power auction in Kosovo*