Renewables

Third big solar power project without subsidies enters pipeline in Albania

Third big solar power project without subsidies Albania

Photo: Samuel Faber from Pixabay

Published

June 4, 2021

Country

Comments

comments icon

0

Share

Published:

June 4, 2021

Country:

Comments:

comments icon

0

Share

The Ministry of Infrastructure and Energy of Albania accepted the application by Info-Telecom for a 50 MW solar power plant in Fier, the third such project of the same size in the same municipality. The photovoltaic facility won’t be eligible for any kind of government support.

The solar power market in Albania is in expansion, mostly due to renewable energy auctions, but legal reforms and a rapid drop in equipment costs over the past decade enabled the emergence of another segment. The Ministry of Infrastructure and Energy announced that it accepted the application from telecommunications operator Info-Telecom, which intends to build a photovoltaic system of 50 MW on a fully commercial basis.

It is the third such project under development in the Fier municipality in the country’s southwest and they are all planned to be of the same size. The ministry issued installation licenses more than two months ago for two solar power plants of 50 MW each, called Blue 1 and Blue 2, to domestic firms Blessed Investment and Matrix Konstruksion.

The projects are not subject to concession agreements or to subsidies and their output will be sold on the market. However, Blue 1 and 2 are obligated to pay royalty proceeds to the ministry in electricity or money equal to 2% of annual production.

The site for the project that Info-Telecom is developing is in Libofshë, between the city of Fier and the Divjakë-Karavasta National Park, where Voltalia is about to build its 140 MW Karavasta solar power plant. The voice carrier serves private clients in Albania and Kosovo*.

* This designation is without prejudice to positions on status and is in line with UNSCR 1244/99 and the ICJ Opinion on the Kosovo declaration of independence.
Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Horius exclusive distributor PupinEnergy chargers Serbia

Horius becomes exclusive distributor of PupinEnergy chargers for Serbia

25 April 2025 - Horius signed an exclusive agreement and became the authorized distributor of PupinEnergy AC electric vehicle chargers in Serbia

Project Albania first gas power plant enters next stage

Project for first gas power plant in Albania enters next stage

25 April 2025 - Greece-based GEK Terna and DEPA Commercial are preparing to build the first gas power plant in Albania, with local partner Gener 2

catl Naxtra Battery sodium ion lithium

CATL: World’s first mass-produced sodium ion battery is here

25 April 2025 - Naxtra breaks resource constraints and strengthens the foundation of the new energy industry, according to CATL

Terna Energy pumped storage wind power hybrid Amari Crete

Terna Energy to make pumped storage, wind power hybrid in Amari in Crete

25 April 2025 - Greek company Terna Energy, recently acquired by Masdar, made a step forward in its Amari hybrid power plant project in Crete