Renewables

Tendering: Concession to build small hydropower plant Štedrić 1

Photo: Pixabay

Published

December 28, 2018

Comments

comments icon

0

Share

Published:

December 28, 2018

Comments:

comments icon

0

Share

The Republika Srpska Ministry of Industry, Energy, and Mining has launched tendering for a concession to build the Štedrić 1 small hydropower plant (SHPP) on the river Štedrić, a tributary of the river Zeleni Jadar.

The construction of SHPP Štedrić 1, with an estimated installed capacity of 0.58 MW and annual output of 3.54 GWh of electricity, is envisaged along the entire course of the river Štedrić, according to the text of the announcement.

The estimated value of the investment to build the run-of-the-river SHPP is around BAM 2.87 million (about EUR 1.45 million).

Along with offers, bidders are required to produce and submit concession award feasibility studies with elements of environmental protection assessment, to be conducted in accordance with applicable regulations.

The maximum concession period is 50 years.

The minimum concession fee is equal to a one-off concession fee for awarded rights of BAM 143,590 (some EUR 73,400) and the concession fee for exploitation of BAM 0.0055 (EUR 0.0028) per kWh of electricity generated.

Srebrenica-based Zemx submitted an initiative for the concession award, in line with article 25 of the concession law. If it files a bid, it will be awarded a bonus of up to 10% of points across bid criteria.

The deadline to file bids is January 25, 2019.

Resistance to small hydropower plants seen across the region

In Serbia, the citizen initiative Defend the Rivers of Mt. Stara Planina has been trying for two years to stop the construction of small hydropower plants in the protected area. The initiative organized a major protest in Pirot in September, and has also announced a protest in Belgrade for late January.

Resistance to SHPPs is also mounting in Bosnia and Herzegovina (BiH) and other countries in the region.

The “Brave women of Kruščica” from BiH have won a formal victory in their battle to block the construction of an SHPP in their town, which lasted for more than a year. Several days ago, a court annulled the SHPP construction permits.

Balkan Green Energy News has an ongoing survey on issues concerning water. Detailed results with an analysis will be announced after the survey closes, in late January 2019.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Belgrade Energy Forum BEF 2026 leaders of energy transition convening in Serbia s capital on May 11 12

Belgrade Energy Forum 2026 – leaders of energy transition convening in Serbia’s capital on May 11-12

04 March 2026 - Balkan Green Energy News has scheduled its Belgrade Energy Forum 2026 for May 11-12. As many as 500 participants are expected for the fourth edition of SEE's premier B2B and B2G energy conference.

slovenia subsidies prosumers solar batteries borzen

New EUR 30 million in subsidies for Slovenian prosumers

03 March 2026 - The funds are intended for legal entities, and the subsidy scheme will be implemented by electricity market operator Borzen

Geothermal district heating EUR 200 million Bucharest Green Tech International

Geothermal district heating investment worth EUR 200 million starts in Bucharest

03 March 2026 - Romania-based Green Tech International declared the start of implementation of a geothermal district heating project in the northern part of Bucharest

solar output snow winter

Record solar output in Romania pushes power prices into negative territory

02 March 2026 - On Friday at 11:39 a.m., commercial solar output, excluding prosumers, reached 2,048 MW, while demand stood at slightly over 6,000 MW