rio-tinto-jadar-lithium-studies

Rio Tinto releases draft environmental impact assessments for Jadar Project

13 June 2024 - Rio Tinto has said it has voluntarily released preliminary drafts of environmental impact assessment studies for its lithium mining project Jadar

International Congress on Process Industry Processing '23 serbia sabac

36th International Congress on Process Industry – Processing ’23. to be held on June 1-2 in Serbia

24 May 2023 - The two-day event will be held in Šabac, where domestic and foreign experts will present 65 papers classified into 11 thematic groups

emissions-carbon-credit-trading-montenegro

Montenegro to use carbon credit revenue to subsidize solar panel installation

09 May 2023 - Montenegro raised some EUR 9.26 million in an auction of emission allowances for 2022

Endangered vultures more important than wind farm project in Greek mountains

Endangered vultures more important than wind farm project in Greek mountains

24 March 2023 - The competent institutions opted for the conservation of bird habitats and gave a negative opinion on the wind farm project

belgrade university committee for environmental protection ratko ristic

Professors from University of Belgrade establish Committee for Environmental Protection

18 November 2022 - The professors said that the state should rely on domestic wisdom and expertise for the preparation of the strategic decisions in the energy sector

Europe could be hit by similar protests against lithium as Serbia

02 November 2022 - Julia Poliscanova from Transport & Environment wrote recommendations on how to avoid challenges for the European car industry including potential protests like the ones in Serbia

eps profit 2020 hidroelektrana medjuvrsje

Serbia’s EPS 2020 profit more than doubles to EUR 137 million

21 April 2021 - Elektroprivreda Srbije's profit last year more than doubled compared with 2019, to EUR 137 million.

Works Vinca incinerator Belgrade recycling

Vinča incinerator project moves ahead but Belgrade still without waste separation system

07 October 2020 - The waste incineration plant under construction in Vinča will make Belgrade lag behind Serbia’s efforts...

dbu-fellowships-2020

Apply for environmental protection fellowships offered by Germany’s DBU

08 May 2020 - The German Federal Environmental Foundation (Deutsche Bundesstiftung Umwelt, DBU) has called for applications for fellowships...

euros-investments

EPS to invest EUR 4.6 billion by 2027, EUR 700 million to go into hydropower, renewables

30 October 2019 - Public power utility Elektroprivreda Srbije (EPS) intends to invest EUR 4.6 billion from 2019 to...

North Macedonia spends EUR 182 million on environmental protection in 2018

11 September 2019 - North Macedonia has spent MKD 11.2 billion (about EUR 181.9 million) on environmental protection in...

trolleybuses

TENDERING: Bids sought to supply 25 trolleybuses for Sarajevo

16 August 2019 - The Ministry of Traffic of Bosnia and Herzegovina’s Sarajevo Canton has invited bids for the...

Page:
1 2 3 4