Renewables

Slovenia’s Petrol unveils 4.8 MW HPP Jeleč in BiH

Photo: Government of Republika Srpska

Published

September 3, 2018

Comments

comments icon

0

Share

Published:

September 3, 2018

Comments:

comments icon

0

Share

Slovenian energy company Petrol has officially unveiled the Jeleč small hydropower plant (SHPP) on the Govza river near Foča in Bosnia and Herzegovina (BiH). The concessionaire invested EUR 6.25 million in the 4.8 MW hydropower plant.

Jeleč, a two-turbine plant, is planned to produce between 14 GWh and 18 GWh of electricity annually, which is sufficient to supply 4,000 households.

https://vimeo.com/277489244

Best known as an oil company and a fuel retailer with a network of filling stations in the region, Petrol has four other SHPPs alongside Jeleč. The four SHPPs in Fojnica, BiH have a combined installed capacity of around 6 MW. Petrol also operates a 20.7 MW wind farm in Šibenik, Croatia. The facilities generate around 80 GWh of electricity annually, enough to cover the electricity consumption of 20,000 households.

At the SHPP Jeleč ribbon-cutting ceremony, Republika Srpska Minister of Industry, Energy, and Mining Petar Đokić recalled that around 20 small hydropower plants have launched production in the entity in the past three years, with another 14 SHPPs currently under construction.

“At the same time, we are conducting preparations to start works on large energy facilities, such as the Buk Bijela hydropower plant on the Drina, and I hope we will be able to launch tendering soon to select the partner for the plant’s construction,” Đokić said.

Rok Vodnik, a managing board member at Petrol, said that he is certain the group will continue investing in renewable energy sources and energy efficiency projects, according to a statement from the Republika Srpska government.

For his part, Foča Mayor Radisav Mašić said that Jeleč is the fourth hydropower plant built on the municipality’s territory in the past four years.

“This SHPP, too, is expected to bring benefits to the residents of Jeleč, the local community, and Republika Srpska. It will help improve the road infrastructure and secure electricity production,” said Mašić, adding that this new hydropower capacity means a boost to the municipal coffers thanks to the concession fee that will be collected.

The statement adds that Mašić said that he is pleased over the announced projects to build HPPs Buk Bijela, Foča, and Paunci on the Drina river.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

world ember bess solar energy storage cost capex lcos

Solar power has become dispatchable anytime at low cost

15 December 2025 - Ember’s assessment of energy storage costs is based on recent auctions in Italy, Saudi Arabia and India and on expert interviews

AI and Energy: the dynamic duo shaping the power grid

AI and Energy: the dynamic duo shaping the power grid

15 December 2025 - How artificial intelligence is reshaping power grids, enabling renewable energy integration while raising regulatory, ethical and sustainability challenges.

nova bess romania battery

Romania’s biggest battery system put into operation

13 December 2025 - Nova Power & Gas has commissioned a battery energy storage system with an operating power of 200 MW and a capacity of 400 MWh

north macedonia power line dalekovod kodar elnos mepso croatia serbia bih

Firms from Croatia, BiH, Serbia to build power line in North Macedonia

12 December 2025 - The contracted works include the construction of a 400 kV power line from the 400/110 kV Bitola 2 substation to the border with Albania