Electricity

Serbia’s hydropower output drops to all-time low amid drought

eps hydropower plants output

Photo: EPS

Published

October 13, 2025

Country

Comments

comments icon

0

Share

Published:

October 13, 2025

Country:

Comments:

comments icon

0

Share

Electricity production at state-owned power utility Elektroprivreda Srbije’s (EPS) hydropower plants is set to hit a historic low this year due to unfavorable hydrological conditions, caused by exceptionally low precipitation in the Drina and Danube river basins over the past 18 months.

The year-end figure will depend on whether and how well the hydrological situation improves in the coming months, EPS said. However, it is already clear that production will be about 25% lower than in 2024 and as much as 40% lower than in 2023, when EPS’ hydropower capacities generated 12.66 terawatt-hours (TWh), according to the statement.

The hydropower plants’ output will be 25% lower than last year

The projected hydropower output for this year is around 8 TWh, less than the all-time low of 8.3 TWh, recorded 36 years ago, EPS added. Since the beginning of 2025, hydropower capacities have generated about 6.5 TWh of electricity.

The average annual production at hydropower plants in the 2010-2024 period was 10.6 TWh, accounting for about 31% of EPS’s total. The total installed hydropower capacity is about 3 GW, according to the state power utility’s website.

Water levels in the Drina and Danube, where EPS’s largest hydropower plants are located, are low due to weak precipitation – both snow and rain – in Germany, Austria, Slovenia, Bosnia and Herzegovina, and Montenegro. At the same time, occasional rainy periods in Serbia this year, as well as recent rainfall, have not significantly affected water inflow to domestic hydropower plants.

The situation has not improved despite occasional rainfall and upgrades to hydropower plants

The revitalizations at the Đerdap 1, Bajina Bašta, and Zvornik hydropower plants have not helped either, even though the reconstructed units are now operating at exceptionally high efficiency, “turning every drop of water into energy.”

EPS also explained that output always depends on river inflows and that they have been far below average on both the Drina and the Danube throughout the year, so much so that there have even been periods when the Danube was not navigable.

On the other hand, the utility claims it is carefully and systematically managing water reserves in reservoirs to preserve them for the upcoming winter season.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

EPCG CBAM Sahmanovic

Šahmanović: Montenegro still in talks on CBAM postponement

28 November 2025 - Montenegro is still negotiating a postponement of the European Union’s carbon border tax or an exemption from the levy

Voltalia receives license for Spitalla PV plant in Albania

Voltalia receives license for Spitalla PV plant in Albania

27 November 2025 - French renewable energy company Voltalia obtained a 30-year license for its Spitalla solar park at the Albanian port city of Durrës

Just Transition Forum unites regional leaders to tackle energy poverty shape fair energy future

Just Transition Forum unites regional leaders to tackle energy poverty, shape fair energy future

27 November 2025 - Governments, partners, civil society and community leaders from across Europe gathered in Tbilisi at the Energy Community’s Just Transition Forum

serbia eps wind farm Kostolac trial operation

Serbia’s EPS starts trial operation of its first wind park Kostolac

27 November 2025 - The construction of Kostolac is complete, and EPS' first wind farm has generated its first megawatt-hours, the company said