Renewables

Romania’s NECP: 6 GW of solar, wind to be installed by 2030

romania necp wind solar 2030

Photo: Pixabay

Published

October 21, 2020

Country

Comments

comments icon

0

Share

Published:

October 21, 2020

Country:

Comments:

comments icon

0

Share

In order to secure energy supply from internal sources and increase the share of renewables, Romania intends to install 6 GW in wind farms and solar power plants, according to its final National Energy and Climate Plan (NECP) for the period 2021-2030.

However, the European Commission’s assessment of Romania’s NECP underlines that the country’s renewables target of 30.7% of gross final energy consumption in 2030 is below the 34% share resulting from the formula in Annex II to Regulation (EU) 2018/1999 on the Governance of the Energy Union and Climate Action.

The formula distributes the efforts across all EU member states in order to achieve a goal at EU level of 32%.

The European Commission has prepared assessments of the final NECPs of all member states, which include their performance in addressing the recommendations after the submission of draft NECPs.

Here you can read the assessments for Bulgaria, Croatia, Cyprus and Greece.

NECPs show how each European Union member country would contribute to the bloc’s energy and climate targets for 2030 with renewables, energy efficiency, greenhouse gas emission cuts, interconnections, and research and innovation. The EU intends to achieve a 40% reduction in GHG emissions from 1990 levels (30% from 2005 levels outside the EU Emissions Trading System), a 32% share for renewables, and a 32.5% improvement in energy efficiency.

Renewables – solar, wind, hydro, nuclear

According to the NECP, Romania wants to ensure energy supply from internal sources as the primary objective for national energy security.

It aims to increase installed capacity by approximately 35% in 2030 compared to 2020 by building wind farms (2.3 GW) and solar power plants (3.7 GW), the NECP reads.

Romania plans to add 1 GW in hydropower plants, and 675 MW in nuclear power plants, but also to decrease the capacity in coal-based power plants by 1.3 GW, and in gas-fired power plants by 400 MW.

As stated in the commission’s assessment, the NECP explains the measures intended to reach the national renewables target for the electricity, heating and transport sectors, but there is no clear quantification of those measures.

romania necp wind solar

Investments – EUR 150 billion needed

Romania has estimated investments for reaching the NECP targets at EUR 150 billion or around 7% of current GDP, of which
EUR 127 billion is for energy demand in the industry and the tertiary, residential and transport sectors. The funds will be spent on electricity grids, power plants and steam boilers.

The sources of funding are EU programmes and ETS revenues, but the commission said there are gaps in investment needs and that there are no details on investments generated by revenues from ETS allowances.

GHG emissions

The NECP sets a 2030 target of a 2% cut in non-ETS greenhouse gas (GHG) emissions. It is in line with the legislated national 2030 target.

The plan does not consider whether overachievement of the target could be cost-efficient if annual emission allocations were to be transferred to other member states, the assessment reads.

Energy efficiency – very low ambition

The country has increased the level of ambition of its national contribution to the 2030 EU level target compared to the draft plan. However, its planned contribution to primary energy consumption is still of low ambition, while for final energy consumption it is of very low ambition.

The commission welcomes Romania’s intention to go beyond a 3% to 4% renovation rate.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

ems ai transmission

EMS plans to use AI in construction approvals

21 November 2024 - EMS has decided to automate its construction approval procedure by introducing state-of-the-art AI solutions

IPTO ENCS cybersecurity grid

Greece’s IPTO joins European Network for Cyber Security

21 November 2024 - The European Network for Cyber Security (ENCS) has announced that IPTO has officially joined the network as a full member

montenegro gvozd epcg nordex agreement

Montenegro’s power utility EPCG begins construction of Gvozd wind farm

21 November 2024 - Wind farm Gvozd will be the first large-scale power generation facility to be built by EPCG in more than 40 years

Bulgarian waterworks firm installs in pipe hydropower generator

Bulgarian waterworks firm installs in-pipe hydropower generator

21 November 2024 - A waterworks and sewerage firm in Bulgaria produces electricity using an in-pipe hydropower device in a supply line