Electricity

Plasma waste gasification project in North Macedonia is getting strategic investment status

Plasma waste gasification plant North Macedonia

Government of North Macedonia

Published

September 6, 2021

Country

Comments

comments icon

0

Share

Published:

September 6, 2021

Country:

Comments:

comments icon

0

Share

A plant worth EUR 327 million in Negotino will handle municipal waste from most of North Macedonia and without air pollution, according to Prime Minister Zoran Zaev. The plasma gasification project is getting a strategic investment status.

After the legal and formal requirements are fulfilled, the Government of North Macedonia will endorse the construction of a proposed system for the treatment of municipal waste without emissions of harmful gases, Prime Minister Zoran Zaev told the press. The plasma gasification plant will be built in Negotino, in the central part of the country, after a EUR 10 million bank guarantee is paid and the parliament votes on the matter, he revealed.

Zaev reiterated the project, with funds from Luxembourg, would have a strategic investment status. In his words, it will be worth EUR 327 million.

Plasma gasification plant to produce gas for production of electricity

The prime minister pointed out the plasma gasification technology that would be used results in no gas emissions. Natural gas will be extracted for the production of electricity, which will be offtaken for EUR 180 per MWh, making the project profitable and sustainable, he added.

Waste will be sorted beforehand to get plastics, iron, paper, glass and other materials for the company’s additional income, Zaev stressed. There are fifty or so projects of the kind in Germany, another 20 to 30 in Austria and several in Slovenia, in his words.

Private firm Zoka Trade (Zoka trejd) secured all the funding, which is coming from Luxembourg, the prime minister said and added that the system would include 22 transfer stations and substations and 100 trucks.

Leftover slag can be used in construction

In May, when he presented a seven-year investment plan for North Macedonia, Zaev claimed 6,000 more dumpsters would be set and that a local road to the Dubrovo village would be paved. He said at the event that the plant would cover 74% of the country’s territory or 48 municipalities.

In thermal plasma gasification, high voltage induces an arc between two electrodes to turn waste into synthetic gas, with molecules broken up into elements. The syngas mostly consists of hydrogen and carbon monoxide, which should be separated into components.

As there is no incineration in the process, oxygen isn’t burned and there is no smoke. All that is left is slag, which can be processed and used in construction.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

montenegro gvozd epcg nordex agreement

Montenegro’s power utility EPCG begins construction of Gvozd wind farm

21 November 2024 - Wind farm Gvozd will be the first large-scale power generation facility to be built by EPCG in more than 40 years

Bulgarian waterworks firm installs in pipe hydropower generator

Bulgarian waterworks firm installs in-pipe hydropower generator

21 November 2024 - A waterworks and sewerage firm in Bulgaria produces electricity using an in-pipe hydropower device in a supply line

montenegro france afd loan spajic vukovic

Montenegro signs EUR 50 million loan agreement with France’s AFD

20 November 2024 - AFD will support Montenegro's reforms in waste management, renewable energy, sustainable forestry, and climate action

district heating decarbonization Wärtsilä chp engines heat power

District heating delivers affordable, flexible decarbonized energy – study

20 November 2024 - The authors have analyzed various revenue streams for combined heat and power generation, particularly combined heat and power engines