Environment

Montenegro stops licensing new small hydropower plants

montenegro small hydropower plants ban

Photo: Flickr/Government og Montenegro

Published

January 18, 2021

Country

Comments

comments icon

0

Share

Published:

January 18, 2021

Country:

Comments:

comments icon

0

Share

The Government of Montenegro has decided to suspend the procedure of approving the construction of new small hydropower plants (SHPPs) until the contracts concluded so far are reviewed.

The new Montenegrin government announced in early December that it would ban new small hydropower plants and review all existing concession agreements. Only a month earlier, the Federation of Bosnia and Herzegovina decided to abolish subsidies for small hydropower plants. These decisions in BiH and Montenegro are a result of the growing public discontent over the damage small hydropower plants cause to the environment.

At its latest session, the Montenegrin government adopted a document on the implementation of projects in the sector of renewable energy sources, which was prepared by the Ministry of Ecology, Spatial Planning and Urbanism.

The construction of SHPP Slatina, which is being built by Milo Đukanović’s son, has also been stopped

The government has agreed to stop approving the construction of small hydropower plant Slatina on the Slatinariver in the municipality of Kolašin, as well as new small hydropower plants, until the revision of the procedure and the legality of concession agreements for small hydropower plants is finished, the document reads.

The new government has already terminated seven concession agreements for the construction of small hydropower plants

Local media reported that the Slatina hydropower plant is being built by a company called BB Hidro, which is co-owned by BlažoĐukanović, son of Milo Đukanović, the President of Montenegro.

According to the document, on December 17, 2020, the government instructed the Ministry of Capital Investments to establish a working group tasked with reviewing the status of concluded concession agreements for small hydropower plants. On December 29, 2020 the government terminated concession agreements for the construction of seven such plants.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Serbia publishes draft environmental protection strategy green agenda for period 2024 - 2033

Serbia publishes draft environmental protection strategy – green agenda 2024-2033

11 September 2024 - The consultations will last until October 3, as announced by the Ministry of Environmental Protection of Serbia

Stausholm Rio Tinto six promises people Serbia Jadar lithium project

Rio Tinto’s CEO makes six promises to people of Serbia regarding Jadar lithium project

09 September 2024 - Rio Tinto's CEO Jakob Stausholm visited western Serbia to promise that the Jadar project for a lithium mine and processing unit is safe

Faculty of Biology Jadar project lithium

Faculty of Biology: Optimal measure to prevent negative impact is to abandon Jadar project

09 September 2024 - The faculty has issued a statement on the three drafts of environmental impact assessment studies for the Jadar lithium project in Serbia

Serbian White Book Waste-to-Energy Belgrade

Serbian White Book on Waste-to-Energy presented in Belgrade

07 September 2024 - The types and composition of generated waste must be determined to be able to manage it, according to the authors of the Serbian White Book on Waste-to-Energy