Energy Efficiency

Financing agreement signed to build new CHP plant, resolve Zenica’s top polluter

Photo: Dans [CC BY-SA 4.0 (https://creativecommons.org/licenses/by-sa/4.0)]

Published

March 18, 2019

Comments

comments icon

0

Share

Published:

March 18, 2019

Comments:

comments icon

0

Share

A financing agreement has been signed for a EUR 53 million project to build a combined heat and power plant (CHP) to use recovery gases from the steelworks in Zenica, instead of coal burned by the current boilers. The project is expected to resolve the city’s district heating issues, as well as to significantly cut emissions in what is one of the most polluted cities in Europe, according to reports.

The new plant is to be built by Toplana Zenica, a joint venture set up by the local unit of ArcelorMittal, the world’s largest steelmaker, the City of Zenica, Finland’s clean energy solutions provider KPA Unicon, and Finnfund, a Finnish development financier focused on sustainable development projects.

The new CHP plant is expected to be operational in June 2020, said ArcelorMittal Zenica CEO Biju Nair.

ArcelorMittal Zenica has a 50% stake in Toplana Zenica, the City of Zenica has 20%, and KPA Unicon and Finnfund hold 15% each.

The European Bank for Reconstruction and Development (EBRD) has arranged a EUR 46 million financing package for the agreement. The package comprises a EUR 28 million loan for the EBRD’s own account and a loan of up to EUR 18 million provided by Banca Intesa Sanpaolo S.p.A., according to a news release from the EBRD.

The steelworks’ CHP plant is Zenica’s sole external provider of heating in the winter. It relies on coal for nearly half its fuel input. It is a major source of sulfur dioxide (SO2) pollution in the city, aggravated by the city’s weather conditions and geographical location in a natural basin, the EBRD said.

Under the project to build the new CHP plants, pollutants released into atmosphere will be drastically reduced compared to those from the existing combined heat and power plant. The dust emissions will be reduced by 94%, SO2 emissions by 89%, and nitrogen oxide emissions by 47%, according to the Non-Technical Summary available on the EBRD’s website.

The project is designed to ensure that the concentration of combustion gases released into atmosphere will comply with both the national standards as well as with the requirements of the relevant European Union regulations (the EU Large Combustion Plants Directive).

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Irene Paoletti (EEIP), Urban industrial symbiosis, a path towards sustainable partnerships

Urban industrial symbiosis: a path towards sustainable partnerships

22 January 2026 - Urban industrial symbiosis can unlock major energy efficiency gains by connecting industry and cities, boosting resilience, competitiveness and decarbonisation in the EU.

eet virtual meter electricity

Austrian EET rolls out AI-powered device to simplify home electricity metering

20 January 2026 - The metering device called the Virtual Meter deduces and delivers the entire home's electricity consumption data in under one second

Spajic Japanese Itochu Montenegro waste energy

Spajić: Japanese company Itochu eyes Montenegro’s waste-to-energy project

09 January 2026 - Prime Minister of Montenegro Milojko Spajić said a 50 MW incinerator is about to be built for municipal waste

AI and Energy: the dynamic duo shaping the power grid

AI and Energy: the dynamic duo shaping the power grid

15 December 2025 - How artificial intelligence is reshaping power grids, enabling renewable energy integration while raising regulatory, ethical and sustainability challenges.