Renewables

Bulgarian city seeks to set up country’s first energy community

gabrovo-bulgaria-first-energy-community

Gabrovo (photo: beni_04 from Pixabay)

Published

November 20, 2023

Country

Comments

comments icon

0

Share

Published:

November 20, 2023

Country:

Comments:

comments icon

0

Share

The Bulgarian Municipality of Gabrovo has issued a public call for joining the country’s first energy community, which would build a solar power plant on the site of a regional landfill for non-hazardous waste. Setting up energy communities in Bulgaria was made possible by recent legislative changes, but the bills are facing opposition from President Rumen Radev.

Bulgaria’s first energy community is expected to develop its renewable energy plant in an investment valued at BGN 180,000 (EUR 92,000). Eligible to take part in the project are individuals, local bodies including municipalities, non-governmental organizations, and small and medium-sized businesses.

The Gabrovo energy community will include both citizens and legal entities

The financial participation of an individual or legal entity can be no less than BGN 500 (EUR 255) and no more than BGN 5,000 (EUR 2,550), according to a statement from the municipality. The call is open until January 31 or until the necessary funds are raised.

According to the statement, an energy community is a group of legal entities and individuals who together produce energy from renewable sources.

The application process has two stages, the first being open only to participants registered on the territory of the municipality of Gabrovo, and the second to participants from other regions of Bulgaria. The city is located in the country’s central part, near Veliko Tarnovo.

Laws regulating energy communities may be overturned

The project comes less than two months after the adoption of changes to Bulgaria’s Law on Energy that introduced energy communities. Bulgaria’s Energy from Renewable Sources Act, which was also amended recently, regulates the establishment and operation of citizen energy communities.

President Radev seeks to overturn the laws so as to protect agricultural land and consumers

The Bulgarian parliament passed the two bills in a bid to avoid losing access to funds from the European Union’s Recovery and Resilience Facility. However, due to controversies over a number of provisions, President Rumen Radev is trying to overturn them both.

Radev has referred the renewables law to the Constitutional Court of Bulgaria to prevent the use of agricultural land for electricity production, and has refused to sign the changes to the energy law over the lack of a mechanism to protect consumers.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Greece DEPA Commercial financing 816 MW solar power portfolio

Greece’s DEPA Commercial obtains financing for 816 MW solar power portfolio

26 July 2024 - State-controlled DEPA Commercial received a EUR 390 million loan from the EIB for photovoltaic projects across Greece

serbia energy cooperative solar power plant elektropionir

First cooperative solar power plants in Serbia start production

26 July 2024 - The income from the sale of electricity will be used for projects proposed by the communities of the villages on the Stara planina mountain

faria renewables mykonos solar power plant

Faria Renewables acquires 35 MW Mykonos solar project

26 July 2024 - Faria Renewables S.A. has announced the integration of photovoltaic project Mykonos into its asset portfolio

Ameresco Sunel Energy 560 MW solar power Greece Lightsource bp

Ameresco Sunel Energy starts building 560 MW solar power plant in Greece for Lightsource bp

26 July 2024 - Ameresco Sunel Energy is the contractor in Lightsource bp's solar power project of 560 MW in peak capacity, in the central part of Greece