Electricity

Greece, Cyprus and Egypt to be connected with underwater electric cable

Photo: euroafrica-interconnector.com

Published

February 14, 2017

Country

Comments

0

Share

Published:

February 14, 2017

Country:

Comments:

0

Share

Greece, Cyprus and Egypt signed a memorandum on the completion of a study for the construction of the EuroAfrica Interconnector, an underwater electric cable connecting the power grids of those countries with continental Europe.

The 1.648 kilometer cable will be one of the longest in the world, with a capacity of 2.000 MW, and the construction will take three years after the conclusion of the feasibility study. The President of EuroAfrica Interconnector Nasos Ktorides said at the signing ceremony in Cairo that this partnership can only bring benefits to the three participating nations.

“Greece will increase its energy efficiency, and will become a major player in the European energy arena, Cyprus will be an electricity hub in the south eastern Mediterranean and Egypt will become an important energy hub for Africa,” he said.

The aim of the Interconnector is to offer significant economic and geopolitical benefits to the involved countries and contribute to the European Union’s target for 10 percent of electricity interconnection between member states.

In a brief address, the ambassadors of Cyprus and Greece expressed the support of their governments in taking the project forward. The conclusion of the necessary studies will mark the beginning of the implementation of the interconnector electric cable.

The submarine EuroAfrica Interconnector will secure the participation of Greece, Cyprus and Egypt in the pan-European electricity grid. Through this project, three countries are to gain energy security and independence and will be able to export power to European countries with energy deficit, according to the press release.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Japan Bistrica pumped storage hydropower project JICA Serbia

Japan approves participation in Bistrica pumped storage hydropower project in Serbia

08 May 2024 - Japan has formalized the participation of state agency JICA in the Bistrica pumped storage hydropower project in Serbia

shell energy europe cropex guarantees of origin

Shell Energy Europe to participate in guarantees of origin auctions in Croatia

08 May 2024 - Shell Energy Europe Limited and 3Degrees Group Inc. have registered for participation in auctions for guarantees of origin at CROPEX

Renewables record 30 global electricity 2023 growth solar wind Ember

Solar, wind push renewables to record 30% global electricity share

08 May 2024 - Renewables generated a record 30% of global electricity in 2023, driven by growth in solar and wind, Ember said in an annual report

AAE gamit slovenia Energie AG wind solar

Energie AG acquires stake in Slovenian wind, solar developer

08 May 2024 - Energie AG aims to develop wind farms and photovoltaic parks in Slovenia with a total capacity of more than 180 MW