News

KESH to clear debts to hydro plant operators by end-June

Published

May 11, 2015

Comments

comments icon

0

Share

Published:

May 11, 2015

Comments:

comments icon

0

Share

Albanian Power Corporation (KESH), state-owned power utility, will clear its debts to private hydropower plants within the first half of this year, according to the Ministry of Energy and Industry (MEI), Albanian Telegraphic Agency reported. The remaining total arrears of less than ALL 2 billion (EUR 14.2 million) will be settled by the corporation’s finance sector without seeking bank loans or financing from the state budget, according to the report on Albreporter.info portal.

Increased liquidity and energy sector reforms will address the financial woes of the country’s energy sector, while the power utility is settling the electricity bills within contractual deadlines with the private hydro plants. In 2014, the accumulated debt to privately-owned power utilities totalled over ALL 6.5 billion and the last month’s payments enabled repayment of arrears accumulated until September of 2014.

According to Energy Minister Damian Gjiknuri, the energy system reform is entering a new intensive stage after the adoption of the new law on the energy sector, with increased liquidity and reforms creating more opportunities to address the sector’s financial problems.

Related Articles

ems ai transmission

Serbia’s TSO EMS plans to use AI in construction approvals

21 November 2024 - EMS has decided to automate its construction approval procedure by introducing state-of-the-art AI solutions

IPTO ENCS cybersecurity grid

Greece’s IPTO joins European Network for Cyber Security

21 November 2024 - The European Network for Cyber Security (ENCS) has announced that IPTO has officially joined the network as a full member

montenegro gvozd epcg nordex Ibrahim Özarslan

Montenegro’s power utility EPCG begins construction of Gvozd wind farm

21 November 2024 - Wind farm Gvozd will be the first large-scale power generation facility to be built by EPCG in more than 40 years

Bulgarian waterworks firm installs in pipe hydropower generator

Bulgarian waterworks firm installs in-pipe hydropower generator

21 November 2024 - A waterworks and sewerage firm in Bulgaria produces electricity using an in-pipe hydropower device in a supply line