Renewables

Hidroelectrica to set up joint venture with EDF for 1 GW pumped storage project

Hidroelectrica joint venture EDF 1 GW pumped storage project

Photo: Hidro Tarnița

Published

December 24, 2025

Country

Comments

comments icon

0

Share

Published:

December 24, 2025

Country:

Comments:

comments icon

0

Share

After numerous failed attempts for half a century, Romania intends to revive the Tarnița-Lăpuștești pumped storage hydropower project in tandem with France’s EDF. State-owned Hidroelectrica published a proposal to its shareholder assembly to establish a 50%-50% joint venture for the 1 GW endeavor. The utility also intends to buy the Frasin-Pângărați pumped storage facility when Hidro Blue Energy builds it.

The plans for Tarnița-Lăpuștești date back to mid-1970s. According to a feasibility study from 2008, updated in 2014, the pumped storage hydropower plant on the river Someşul Cald in Romania would consist of four units of 250 MW each. After numerous failed attempts, the Ministry of Energy sat with the representatives of Japanese Itochu and French EDF last year to discuss the project.

In November 2024, Romania signed a memorandum of understanding with Itochu. The latest update came from government-controlled hydropower plant operator Hidroelectrica. It has just scheduled an extraordinary general meeting of shareholders for January 27.

Romania may fast-track Tarnița-Lăpuștești project

In a stock exchange filing, Hidroelectrica said it is proposing a joint undertaking with EDF Power Solutions International, where both state-owned companies would have equal stakes.

The location for Tarniţa-Lăpuşteşti is 30 kilometers from Cluj-Napoca, Transylvania’s biggest city. The old study envisages five to seven years of construction. Within a legislative push to unlock dormant hydropower projects, the project could be given a priority status. In that case, it would be exempted from some permits including the obligation to conduct the study all over again.

Hidroelectrica plans to buy Frasin-Pângărați pumped storage hydropower plant upon its commissioning

In another item for the meeting, Hidroelectrica seeks approval for obtaining advisory services with regard to its intention to acquire, upon commissioning, the Frasin-Pângărați pumped storage hydropower plant.

A company called Hidro Blue Energy is working on the project for 300 MW. The location is in Neamț County in the northeast. Lake Bicaz would be the facility’s lower reservoir.

Hidroelectrica said it would update shareholders about the upcoming refurbishment of pumped storage systems Petrimanu, Jidoaia and Lotru, downstream of the Dorin Pavel hydropower plant. The utility has awarded the contract to Electromontaj, with Elin Motoren, Voith Hydro and Butan Grup as subcontractors.

The project is worth EUR 97.9 million, excluding value-added tax.

Hidroelectrica is also rehabilitating hydroelectric plants Gogoșu, Bradișor and Stejaru.

The company has RON 56.23 billion (EUR 11.04 billion) in market capitalization, according to data from the Bucharest Stock Exchange. The government has an 80.1% share.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Hidroelectrica joint venture EDF 1 GW pumped storage project

Hidroelectrica to set up joint venture with EDF for 1 GW pumped storage project

24 December 2025 - Romania intends to revive the Tarnița-Lăpuștești pumped storage hydropower project in tandem with France's EDF

north macedonia marko bislimoski esm solar electrcity market coal

Bislimoski urges ESM to pivot toward market procurement of electricity

24 December 2025 - ​Energy agency chief Marko Bislimoski doesn’t see the future of Elektrani na Severna Makedonija only in production

OX2 completes 99 MW wind farm Romania starts building another clients

OX2 completes 99 MW wind farm in Romania, starts building another – for clients

24 December 2025 - OX2 installed the last turbine at Nala Renewables' Green Breeze wind farm in Romania, just after breaking ground on the Ansthall project for HELLENiQ Energy and buying three wind projects

UAE Mubadala to invest EUR 300 million in Rezolv Energy

UAE’s Mubadala to invest EUR 300 million in Rezolv Energy

24 December 2025 - Mubadala Investment Compan has committed EUR 300 million to a joint venture with Actis that operates Rezolv Energy