Renewables

Montenegro seeks contractor for marking liquid oil-derived fuel, biofuel

Montenegro tender contractor marking liquid oil derived fuel biofuel

Photo: Ministry of Energy and Mining

Published

September 30, 2025

Country

Comments

comments icon

0

Share

Published:

September 30, 2025

Country:

Comments:

comments icon

0

Share

With approval from the Government of Montenegro, the Ministry of Energy and Mining issued a public call for the selection of a legal person that would conduct the obligatory marking of liquid fuel and biofuel in the Montenegrin market.

The introduction of fuel marking is an important step in the fight against the gray economy and illegal trade, but also a measure strengthening fiscal discipline and the state’s energy system, according to the announcement. The ministry added that Montenegro is introducing the practice in line with its Fiscal Strategy 2024-2027, to secure greater transparency and the security of supply.

The selected legal person will be obligated to use a unique marker for the Montenegrin market – type A for fuel subject to excise tax and type B for fuel exempted from excise tax, as well as to establish an information system accessible to all relevant instutions. This is the way to secure a total control of fuel trade and consumer protection, the explanation reads.

The maximum price of the fuel marking service amounts to EUR 0.008 per liter, which is EUR 8 per 1,000 liters of fuel, the Government of Montenegro stipulated in its decision from September 18.

Offers are received every workday between 10:00 and 14:00, through October 31, 2025. The address of the Ministry of Energy and Mining is Rimski trg 46, Podgorica.

The tender documentation with all the details and criteria is available on the ministry’s website.

With the new measure, Montenegro strengthens the control over the energy market, protects citizens and the country’s budget and builds additional trust in the energy system, the update adds.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Nordex Group launches blade manufacturing in Turkey

Nordex Group launches blade manufacturing in Turkey

25 May 2026 - Nordex Group started production of wind turbine blades in Menemen in western Turkey, counting on growing demand for high-efficiency onshore turbines

Maglizh solar bess hybrid bulgaria

Bulgaria’s 161 MW Maglizh solar plant with BESS officially opened

25 May 2026 - Hybrid photovoltaic power plant Maglizh has officially launched operations following the installation of a 72 MWh BESS

serbia eu region bef 2026 grid flexibility panel

Renewable energy ambitions must include ways to ensure grid integration

22 May 2026 - Market participants in the region have differing views of the current state of the grid, according to a panel held at Belgrade Energy Forum 2026

Greece PPC Group raises EUR 4.5 billion in capital offering

Greece’s PPC Group raises EUR 4.5 billion in capital offering

22 May 2026 - Public Power Corp. conducted a historic share capital increase of EUR 4.5 billion. The government and existing stockholder CVC covered 55.6%.