Waste

Zagreb picks technological solution for city’s waste management system

zagreb waste management center tomasevic

Photo: City of Zagreb

Published

November 22, 2024

Country

Comments

comments icon

0

Share

Published:

November 22, 2024

Country:

Comments:

comments icon

0

Share

The City of Zagreb presented the design of waste management center CGO Zagreb and claimed it would be a modern facility finally enabling the closure of the Jakuševac landfill.

In January of this year, the Zagreb City Assembly adopted a feasibility study for the central waste management project for the Croatian capital and Zagreb county, which surrounds it.

The city has selected technological solution C, one of the three proposed, based on an analysis of municipal waste processing technologies as part of the updated feasibility study. The main elements of the solution for CGO Zagreb are:

  • mechanical and biodrying of mixed municipal waste from the city and Zagreb county
  • mechanical processing (sorting, refining) of separately collected packaging waste from the city of Zagreb and recyclable large fractions of mixed municipal waste
  • mechanical processing (sorting, refining) of separately collected paper and cardboard from the city
  • biological treatment of separately collected biowaste from ​​the city
  • CGO Zagreb will be built next to the city’s existing central wastewater treatment plant CUPOVZ.

The project includes a new generation of closed facilities that won’t harm the citizens’ quality of life, according to the local authority. It would be financed by the City of Zagreb and Zagreb County in line with the shares of mixed municipal waste generated in the two territories. The establishment of CGO Zagreb would fulfill an obligation from the National Waste Management Plan.

zagreb croatia waste management center waste flow
Waste flows in CGO Zagreb

According to earlier statements, the total investments for each of the three proposed technological solutions range from EUR 137 million to EUR 146 million.

Mayor Tomislav Tomašević noted that the local authority is sticking to the time frame presented early this year. According to the plan, CGO Zagreb would be put into trial operation toward the end of 2028, he added.

The city isn’t waiting for anyone and it plans to secure financing from the European development banks that are applying the highest environmental standards, according to Tomašević.

The city, in his words, is going to take over the entire waste management system and cut dependence on private firms.

According to the time frame, the location permit will be obtained by November 2025 to enable holding the tender for construction by February 2026, and to start building the facility by October 2026.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Threat mass exodus desalination plants bombed in Iran Gulf countries

Threat of mass exodus as desalination plants targeted in Gulf countries, Iran

09 March 2026 - The Iran war could heavily disrupt the water supply in the region, and desalination plants in particular, alongside environmental disasters

croatia air pollution pollutants emissions report

Croatia reduces air polluting emissions by up to 98% – ministry

09 March 2026 - The Government of Croatia issued a report on the air pollutant emissions inventory for 2026, covering the period from 1990 to 2024

north macedonija electric buses skopje

North Macedonia to purchase 150 electric buses

02 March 2026 - Authorities believe electric buses will reduce air pollution, improve public transport services, and cut costs

drina buk bijela lake

Hydropower plants to transform upper Drina river into lake, say environmentalists

25 February 2026 - The planned hydropower plants on the upper course of the Drina will alter the ecosystem and local climate, the Center for Environment warned