Electricity

Romania to introduce mandatory cyber audit for solar power plants

romania cyber security audit solar power

Photo: Pixabay

Published

October 31, 2024

Country

Comments

comments icon

0

Share

Published:

October 31, 2024

Country:

Comments:

comments icon

0

Share

An executive order drafted by Romania’s Ministry of Energy includes provisions for a mandatory cyber audit of solar power plants to prevent cyberattacks on the country’s power grid.

Inverters and all IT components in photovoltaic systems, small and large, will undergo a cybersecurity audit due to concern they are sending data to third countries, the Ministry of Energy said.

The ministry has launched a public debate on an executive order changing the Law on Electricity and Natural Gas law and the Law on the Establishment of the System for Promoting the Production of Energy from Renewable Sources.

The proposed decree aims to create a solid and sustainable framework for the development of energy storage capacities, the establishment of a regime, in the national interest, for strategic electricity production projects, and the implementation of cyber audit measures for the safety of photovoltaic systems, according to the ministry.

The measure intends to protect national infrastructure against digital vulnerabilities

The order establishes the mandatory cyber audit of newly built photovoltaic plants. Cybersecurity audits of inverters and all IT components of PV facilities would be done periodically.

The measure intends to protect national infrastructure against digital vulnerabilities, having in mind risks from imported equipment and its potential to transmit data to state and non-state parties hostile to Romania without the operators’ consent, the ministry underlined.

The document also covers pumped storage technologies by introducing clarifications for the operation of pumped storage hydropower plants.

Burduja: The energy transition is no longer a long-term goal, but a national emergency

Minister of Energy Sebastian Burduja said the draft executive order provides a framework to turn green transition ambitions into reality and strengthen energy security through innovation.

“The energy transition is no longer a long-term goal, but a national emergency. We are opening the doors wide for investments in pumped storage hydropower plants and electricity storage projects,” Burduja stated.

Romania hosts solar power plants of 3,700 MW in total capacity. About 2,000 MW are photovoltaic systems owned by more than 100,000 prosumers – households, firms and institutions.

As for pumped storage hydropower plants, the country recently announced that it is negotiating with the Itochu-EDF consortium regarding the construction of the Tarnița-Lăpuștești facility.

In July, Burduja said the government would sign contracts for 1.5 GWh in battery capacity.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

CJR Renewables 102 MW Urleasca wind farm Romania

CJR Renewables completes construction of 102 MW Urleasca wind farm in Romania

09 October 2025 - The Urleasca wind farm in Brăila county in eastern Romania is complete, contractor CJR Renewables said

slovenia coal phaseout coal mine velenje golob robert visit

Slovenia begins preparations for closure of Velenje coal mine

09 October 2025 - Slovenian Prime Minister Robert Golob visited the Velenje coal mine to present a draft law on its gradual closure

Metlen Karatzis Greece largest battery joint venture

Karatzis, Metlen to install Greece’s largest battery in joint venture

09 October 2025 - Metlen and Karatzis Group of Companies are establishing a joint venture for a standalone BESS of 330 MW and 790 MWh

world dnv energy transition energy transition outlook 2025

Policy changes in US will have marginal impact on global energy transition

09 October 2025 - AI energy use may seem alarming, but it is projected to stay below EV charging and the cooling of buildings, DNV calculated