Electricity

North Macedonia’s power utility ESM gets new top management

north macedonia esm uzuncev elektrani na severna makedonija

North Macedonia's capital Skopje (photo: Dimitris Vetsikas from Pixabay

Published

August 26, 2024

Comments

comments icon

0

Share

Published:

August 26, 2024

Comments:

comments icon

0

Share

North Macedonia’s state-owned power utility Elektrani na Severna Makedonija has got a new board of directors and a new general manager and top management.

On the recommendation of the Government of North Macedonia, the Supervisory Board of state power company Elektrani na Severna Makedonija (ESM) has appointed a new Board of Directors, ESM said.

Lazo Uzunčev was appointed President of the Board of Directors and General Manager of the joint-stock company. Uzunčev has a degree in mechanical engineering and has held various management positions in the private sector.

The new general manager is Lazo Uzunčev

Apart from Uzunčev, other members of the Board of Directors were also appointed. They are Redžep Asani, deputy general manager, Đorđi Đorđijevski, manager for legal and general affairs, Zoran Konjanovski, manager for electricity generation, Viktor Jovanovski, commercial director, Ivan Stojanovski, manager of financial affairs, and Vladimir Pejoski, manager for development and investments.

As the ESM general manager, Uzunčev replaces Vasko Stefanov, who was appointed in April 2023.

The new management’s priority is to ensure the country’s energy stability through efficient management, financial consolidation, and strengthening the company’s capacities at all levels, ESM said.

North Macedonia elected a new government in June

The goals of the new management also include cost optimization and the implementation of development projects to promote ESM into a competitive company that will cover the electricity needs of end consumers, while professionally adapting to market conditions and stringent environmental protection standards.

Of note, as a result of the last election, North Macedonia got a new government at the end of June.

The Minister of Energy, Mining and Mineral Resources in the government of Prime Minister Hristijan Mickoski is Sanja Božinovska.

After her appointment as minister, she noted that it was urgent to tackle unreasonable expenditure, excess employment, and corruption within state-owned power company ESM and transmission system operator MEPSO.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Nordex gets order for 70 MW wind power project Jasikovo in Serbia

Nordex gets order for 70 MW wind power project Jasikovo in Serbia

24 March 2026 - Nordex Group received an order for the supply and installation of eleven N175/6.X wind turbines for the Jasikovo wind farm in eastern Serbia

Serbian student team H-Bridges IEEE IFEC 2026 semifinals IEEE APEC conference

Serbian student team H-Bridges in IEEE IFEC 2026 semifinals at IEEE APEC conference

24 March 2026 - The H-Bridges student team from Serbia is in the semifinals of the International Future Energy Challenge (IFEC) competition in San Antonio, California, within the IEEE Applied Power Electronics Conference and Exposition.

World adds record 814 GW of solar wind in 2025

World adds record 814 GW of solar, wind in 2025

23 March 2026 - The world expanded its solar and wind power capacity by a record 814 GW altogether last year, or 17% more than in 2024, Ember found

entso e spain portugal blackout final report

ENTSO-E publishes final report on 2025 Spain, Portugal blackout

23 March 2026 - The report on the grid incident in Spain and Portugal on April 28 was produced by a technical expert panel of 49 members, ENTSO-E said