Electricity

Biljana Komnenić takes helm of Serbia’s DSO

eds ceo biljana komnenic elektrodistribucija srbije

Biljana Komnenić (photo: EDS)

Published

July 22, 2024

Country

Comments

comments icon

0

Share

Published:

July 22, 2024

Country:

Comments:

comments icon

0

Share

The Government of Serbia has dismissed Bojan Atlagić as acting director of Elektrodistribucija Srbije and appointed Biljana Komnenić as the new acting chief of the country’s distribution system operator.

Since November 2023, Biljana Komnenić has held the position of manager of the Technical System at Elektrodistribucija Srbije (EDS). As a distribution system operator (DSO), EDS is in charge of the low-voltage and medium-voltage grid, supplying electricity to households and companies.

She replaces Bojan Atlagić, who was appointed acting director in June 2016. According to the EDS website, he has been employed at Elektrovojvodina, a branch of state-owned power producer Elektroprivreda Srbije (EPS), since 2000. In 2012, he was appointed director of Elektrodistribucija Novi Sad, part of EPS.

Bojan Atlagić was dismissed as acting director

According to EDS, Biljana Komnenić graduated from the Faculty of Electrical Engineering. She taught at the Electrical Engineering School in Pančevo. After that, she moved to chemical industry firm HIP Azotara Pančevo, where she worked as a maintenance engineer.

Since 1998, she has been employed at Elektrovojvodina – Elektrodistribucija Pančevo, part of EPS, where she was appointed director in 2006, EDS said.

In 2015, she was appointed as the director of the Elektrovojvodina Regional Center within EPS Distribucija Beograd, also part of EPS. After the state power utility’s restructuring, she served as the director of the Sector for Planning and Investments in Novi Sad.

EDS was created after EPS’ unbundling

EDS was created after the electricity distribution business was unbundled from EPS.

A few days ago, EDS and the European Investment Bank signed an agreement on an EUR 80 million loan for the purchase and installation of around 400,000 smart electricity meters.

The loan will be used to replace around 400,000 existing meters. This will create the conditions to additionally reduce electricity losses and introduce more efficient consumption management.

The existing electricity meters will be replaced in Kruševac, Užice, Vranje, Mladenovac, Prokuplje, Leskovac, Jagodina, Valjevo, Smederevo, Šabac, and Lazarevac.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

ems ai transmission

EMS plans to use AI in construction approvals

21 November 2024 - EMS has decided to automate its construction approval procedure by introducing state-of-the-art AI solutions

IPTO ENCS cybersecurity grid

Greece’s IPTO joins European Network for Cyber Security

21 November 2024 - The European Network for Cyber Security (ENCS) has announced that IPTO has officially joined the network as a full member

montenegro gvozd epcg nordex agreement

Montenegro’s power utility EPCG begins construction of Gvozd wind farm

21 November 2024 - Wind farm Gvozd will be the first large-scale power generation facility to be built by EPCG in more than 40 years

Bulgarian waterworks firm installs in pipe hydropower generator

Bulgarian waterworks firm installs in-pipe hydropower generator

21 November 2024 - A waterworks and sewerage firm in Bulgaria produces electricity using an in-pipe hydropower device in a supply line