Renewables

Montenegro’s CGES signs two more grid connection agreements for solar power plants

cges solar power montecevo cwp asanovic gazivoda

Foto: CGES

Published

August 8, 2023

Country

Comments

comments icon

0

Share

Published:

August 8, 2023

Country:

Comments:

comments icon

0

Share

Montenegro’s transmission system operator CGES has signed agreements on connecting two more planned solar power plants, with a total installed capacity of 615 MW. The investors are Sun Horizon, and Obnovljivi Izvori Energije.

In mid-June, TSO CGES inked its first grid connection agreement for a solar power project. The three projects have a total capacity of more than 1,000 MW.

The contract on the connection of the 400 MW Montechevo solar power plant, was signed by Ivan Asanović, CEO of CGES, and Darija Gazivoda, executive manager of Sun Horizon. The investment is estimated at EUR 350 million.

The firm is a subsidiary of CWP Europe, one of the leading companies in the development of renewable projects in South-East Europe.

According to CGES, connecting Montechevo implies the construction of the 400 kV Čevo switchyard (RP Čevo), one of the largest in the region. It will consist of four 400 kV power lines: Lastva-Trebinje, Lastva-Pljevlja, and Lastva-Podgorica.

In addition to higher connection capacity, the technical solution would enable better performance of the transmission system, because it eliminates the possibility of a simultaneous outage of the 400 kV transmission lines towards Trebinje and Pljevlja.

CGES: The grid is largely prepared for the integration of new renewable power plants

The agreement defines a dynamic plan, which foresees that the Montechevo project and RP Čevo would be built by the end of 2027.

CGES said the integration of renewable electricity facilities into the existing grid poses technical challenges, but that power lines are largely prepared.

The company stressed that it invested a vast amount of funds in grid upgrades and that it would continue such activities and work on new regional projects.

cges solar power power plant predis asanovic

Asanović and Rusmin Muslić, executive manager of Obnovljivi Izvori Energije, signed the second contract, for the Prediš photovoltaic plant. It is planned at 215 MW in capacity, while the investment is valued at EUR 180 million.

The solar power facility will be connected via a 400 kV transmission line to RP Čevo, CGES added.

Of note, a large number of utility-scale PV projects are under development in Montenegro, but none are under construction yet.

In other news, the Government of Montenegro issued urban planning and technical requirements for the preparation of technical documentation for a 100 MW project.

The location is near Nikšić, in the Vraćenovići settlement. The request for the solar power project was submitted by Agenos Energy from Podgorica.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Rezolv Energy landmark cross border VPPA giant wind park Vifor

Rezolv Energy signs landmark cross-border VPPA for its giant wind park Vifor

30 March 2026 - Etem Gestamp is sourcing electricity for its operations in Bulgaria from Rezolv Energy’s 461 MW Vifor wind farm in Romania

Serbia SEEPEX power exchange introducing negative prices

Serbia’s SEEPEX power exchange introducing negative prices

30 March 2026 - Serbian power bourse SEEPEX will enable negative prices on May 5 and 6. North Macedonia's NEMO is launcing intraday market at the same time.

serbia world bank loan gas pipelines energy efficiency subsidies dubravka djedovic gil pontara

Serbia negotiating loan to finance gas pipelines, energy efficiency

27 March 2026 - The Government of Serbia is discussing a new program to finance the construction of gas pipelines and subsidize energy efficiency measures

Andritz ten turbines modernization hydropower cascade Vlasina in Serbia

Andritz to supply ten turbines for modernization of hydropower cascade in Serbia

27 March 2026 - Serbian contractor Energotehnika Južna Bačka selected Andritz to supply ten new turbines for the modernization of EPS's Vlasina hydropower cascade