Renewables

EU pays out EUR 1.4 billion to Bulgaria, Croatia, Romania for green transition

EU modernization fund Bulgaria Croatia Romania

Photo: Park Białowieski from Pixabay

Published

June 9, 2023

Country

Comments

comments icon

0

Share

Published:

June 9, 2023

Country:

Comments:

comments icon

0

Share

The European Union paid out EUR 2.4 billion from its Modernisation Fund in its largest joint disbursement so far, to boost green transition in seven member states including Bulgaria, Croatia, and Romania. The three countries have received EUR 1,385 billion in total.

The grants from the Modernisation Fund are for 31 projects for renewable electricity generation, modernization of energy networks, and energy efficiency. They will lead to the reduction of greenhouse gas emissions in energy, industry, and transport, the European Commission said.

The fund is financed by revenues from auctions of emission allowances under the EU’s Emissions Trading System (EU ETS).

Bulgaria received EUR 197 million, compared to EUR 88 million for Croatia, and Romania got a EUR 1.1 billion tranche. The remaining countries are Czechia (EUR 1 billion), Latvia (EUR 5 million), Lithuania (EUR 1 million), and Poland (EUR 47 million).

Bulgaria intends to invest in the power grid while Croatia said it would use the funds to support renewable energy production

All four projects in Bulgaria are intended for the modernization and development of the electricity distribution grid to accelerate the electrification of transport, storage deployment, and the decarbonization and decentralization of energy consumption and production.

The country plans to develop information systems and physical infrastructure of the distribution grid, roll out smart meters, and integrate the Metering Data Management (MDM) System, according to the decision.

Croatia intends to use the money to support renewable energy production and energy efficiency measures. It plans to help public water and waste service providers install photovoltaic panels and energy storage capacity. The manufacturing industry is eligible for energy efficiency improvements and high-efficiency cogeneration.

Romania intends to invest EUR 800 million in solar, wind, and hydropower projects

Eight projects for new renewable electricity production capacities, district heating, and gas infrastructure to replace coal-powered energy are set to be implemented in Romania.

EUR 800 million is envisaged for support to investments in solar, wind, and hydropower systems. The scheme includes funds for self-consumption, among which for public institutions and beneficiaries in the agricultural and food sectors to become prosumers.

Romania also intends to support the modernization and rehabilitation of the district heating network with EUR 190 million.

The Modernisation Fund supports ten EU countries

According to the European Commission, the investments will help the selected countries to reduce dependency on Russian fossil fuels, meet their 2030 climate and energy targets, and contribute to the EU’s long-term commitment to reaching climate neutrality by 2050.

Total disbursements from the Modernisation Fund since January 2021 reached EUR 7.5 billion, benefitting 10 eligible member states: Bulgaria, Croatia, Czechia, Estonia, Hungary, Latvia, Lithuania, Poland, Romania, and Slovakia.

The aim of the Modernisation Fund is to help EU member countries that have lower incomes in their transition to climate neutrality.

It supports investments in renewables, energy efficiency, energy storage and the modernization of energy networks including district heating, pipelines and grids, and the just transition in carbon-dependent regions, the commission said.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Montenegro NECP public consultation sole coal plant shutdown 2041

Montenegro publishes NECP for public consultation – sole coal plant planned for shutdown in 2041

30 June 2025 - The retirement of the Pljevlja coal plant is planned for 2041, but it depends on a just transition and supply security, the draft NECP reads

LONGi ignites Romania energy transition 54 1 MW BC

LONGi ignites Romania’s energy transition with 54.1 MW BC technology triumph

30 June 2025 - A PV plant in Romania's northwest is on schedule for a grid connection in the fourth quarter. It features LONGi Solar's BC modules.

Fortis Energy Albania 62 MW solar power

Fortis Energy gets green light in Albania for 62 MW solar power project

27 June 2025 - Fortis Energy received approval from the Albanian government for the construction of a 62 MW solar power plant in the country's southeast

Hidroelectrica construction pilot floating photovoltaic plant

Hidroelectrica to begin construction of its pilot floating photovoltaic plant

27 June 2025 - Romanian state-owned hydropower plant operator Hidroelectrica picked the contractor for a 10 MW floating solar power plant, its first