Renewables

Profine Energy developing battery-backed solar power projects of 550 MW in Serbia, BiH

profine energy serbia bih solar bulgaria

Photo: Foto: Kev from Pixabay

Published

March 13, 2023

Comments

comments icon

0

Share

Published:

March 13, 2023

Comments:

comments icon

0

Share

Germany-based Profine Energy said it would build two solar power plants with a combined capacity of 550 MW in Bosnia and Herzegovina and Serbia and that the facilities would include battery storage. The firm is a joint venture between PVC doors and windows manufacturer Profine and energy company Wirth Group.

A solar power plant with a capacity of 450 MW will be installed next to a carbon-free industrial park in Serbia. The investment is estimated at EUR 2 billion, owner and manager of Profine Peter Mrosik said at a press conference in Sofia, SeeNews reported.

The industrial park should be built over 800 hectares between Novi Sad and the capital Belgrade. The solar power plant in BiH, where Profine has a factory, would have a capacity of 100 MW.

The solar plant would supply the factories in the industrial park

At the end of June last year, Mrosik met with the President of Serbia, Aleksandar Vučić, to discuss the expansion of the company’s location in the country, a 600,000 square meter property.

At the time, Profine said it planned to build a production site to serve as a hub for South-Eastern Europe and a photovoltaic system.
The company added that the power plant, operated by Profine Energy, would supply production facilities in the park.

Profine said it would invest EUR 1 billion in Bulgaria

Mrosik now also said the joint venture is planning a EUR 25 million solar panel factory in Montana in the northwest of Bulgaria.

The investment will be implemented if the company proceeds with a proposed floating solar power project on the Ogosta artificial lake in the same area. Environmentalists and a group of locals oppose the planned facility, which would have 500 MW to 1.5 GW capacity.

Profine Energy said in November that it is prepared to invest EUR 1 billion in Bulgaria.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

CJR Renewables 102 MW Urleasca wind farm Romania

CJR Renewables completes construction of 102 MW Urleasca wind farm in Romania

09 October 2025 - The Urleasca wind farm in Brăila county in eastern Romania is complete, contractor CJR Renewables said

slovenia coal phaseout coal mine velenje golob robert visit

Slovenia begins preparations for closure of Velenje coal mine

09 October 2025 - Slovenian Prime Minister Robert Golob visited the Velenje coal mine to present a draft law on its gradual closure

Metlen Karatzis Greece largest battery joint venture

Karatzis, Metlen to install Greece’s largest battery in joint venture

09 October 2025 - Metlen and Karatzis Group of Companies are establishing a joint venture for a standalone BESS of 330 MW and 790 MWh

world dnv energy transition energy transition outlook 2025

Policy changes in US will have marginal impact on global energy transition

09 October 2025 - AI energy use may seem alarming, but it is projected to stay below EV charging and the cooling of buildings, DNV calculated