Electricity

Port of Bar preparing to build LNG terminal, gas-fired power plant

Port-of-Bar-gas-terminal-lng-alliance-gas-power-plant

Photo: Port of Bar

Published

June 17, 2022

Country

Comments

comments icon

0

Share

Published:

June 17, 2022

Country:

Comments:

comments icon

0

Share

Montenegro’s main sea port, the Port of Bar, has signed a memorandum of understanding with Singapore-based LNG Alliance on the construction of a liquefied natural gas (LNG) terminal and a 100 MW gas-fired power plant. The signature comes just months after a similar document was signed between LNG Alliance and state power utility Elektroprivreda Crne Gore (EPCG).

The Port of Bar has signed an MoU with LNG Alliance Pte Ltd, which is interested in investing in an LNG terminal and a gas-fired power plant with a capacity of at least 100 MW, said Ilija Pješčić, CEO of the company operating the port, Vijesti reported.

LNG Alliance builds terminals around the world under turnkey contracts.

EPCG signed an MoU with LNG Alliance in November 2021

Pješčić said that EPCG would be a partner on the project, adding that LNG Alliance itself is prepared to invest USD 200 million and employ between 70 and 100 people.

As recently as last month, the company’s vice-president for investment and development projects, Dhananjoy Kumar Das, met with Montenegrin Deputy Prime Minister and Minister of Capital Investments Ervin Ibrahimović.

The MoU signed with EPCG envisages a feasibility study and a study of environmental and social impacts of gas power plants near the city of Bar and the capital Podgorica that would help develop technical and commercial solutions.

EPCG plans the construction of three gas-fired power plants

EPCG said at the time that LNG Alliance would ensure the necessary conditions for investing in the power plants. Gas that would be used in electricity production would come from a terminal at the Port of Bar, which would be built by LNG Alliance, EPCG said in a statement at the time.

The Montenegrin power utility promptly invited bids in December to select a consultant to produce a study detailing technical solutions and a pre-feasibility study for gas-fired power plants near Bar, Podgorica, and Pljevlja. The construction of a gas power plant near Bar was also announced by the country’s former prime minister, Zdravko Krivokapić.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

serbia eu region bef 2026 sanja bozinovska cooperation

Božinovska at BEF 2026: Regional cooperation is not a choice, but a necessity

11 May 2026 - The fourth edition of Belgrade Energy Forum (BEF 2026) has brought together 500 participants

Belgrade Energy Forum 2026 EU support necessary decarbonization Western Balkans

Belgrade Energy Forum 2026: EU’s support necessary for decarbonization in Western Balkans

11 May 2026 - The Western Balkans have progressed in decarbonization and integration with the EU's single energy market, but it must add speed, and with EU's help, top officials agreed at Belgrade Energy Forum 2026 in Serbia

Montenegro EPCG trial run of first wind park Gvozd

Montenegro’s EPCG starts trial run of its first wind park – Gvozd

10 May 2026 - EPCG launched the trial operation of its first wind power plant. Gvozd would be the biggest in Montenegro when the second phase is completed.

Hellenic Hydrogen wins European Hydrogen Bank grant with lowest bid

Hellenic Hydrogen wins European Hydrogen Bank grant with lowest bid

08 May 2026 - The European Hydrogen Bank (EHB) approved EUR 1.09 billion in the third auction. A Greek JV won with the lowest bid in the general category.