Renewables

Polish, Spanish firms to install two wind farms in Serbia

Polish, Spanish firms to install two wind farms in Serbia

Photo: Pexels from Pixabay

Published

February 24, 2022

Country

Comments

comments icon

0

Share

Published:

February 24, 2022

Country:

Comments:

comments icon

0

Share

The Municipality of Mali Iđoš has published the detailed regulation plan for the construction of the wind farms Lovćenac, with a capacity of 300 megawatts (MW), and Feketić, of 90 MW.

The Lovćenac wind farm will be installed by WPP West Wind based in Belgrade, owned by Polish renewable company V-Ridium Wind, while Feketić is being developed by Ecoener Wind Power, registered in Belgrade and owned by Grupo Ecoener from Spain, eKapija portal reported.

The detailed regulation plan for the Lovćenac wind farm covers an area of ​​about 5,720 hectares. It includes the cadastral municipalities of Lovćenac, Feketić and Mali Iđoš which stretch east of the Belgrade-Subotica highway along the border with the municipalities of Bečej, Srbobran and Bačka Topola in Serbia’s northwest.

Lovćenac will have about 50 wind turbines, and 21 are envisaged for Feketić

The land intended for construction is predominantly agricultural, and privately owned.

The Lovćenac wind farm will comprise about 50 wind turbines, and due to the proximity of villages Mali Iđoš, Lovćenac and Feketić, certain construction restrictions will be imposed. They will be defined after analysis through modeling of noise dispersion and shadow flicker, as well as analysis on the visual impact on populated places.

The Feketić wind farm should have 21 wind turbines spanning 2,100 hectares south of the settlement of Feketić. The land on which it is planned is also agricultural and privately owned.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

EPCG CBAM Sahmanovic

Šahmanović: Montenegro still in talks on CBAM postponement

28 November 2025 - Montenegro is still negotiating a postponement of the European Union’s carbon border tax or an exemption from the levy

Voltalia receives license for Spitalla PV plant in Albania

Voltalia receives license for Spitalla PV plant in Albania

27 November 2025 - French renewable energy company Voltalia obtained a 30-year license for its Spitalla solar park at the Albanian port city of Durrës

Just Transition Forum unites regional leaders to tackle energy poverty shape fair energy future

Just Transition Forum unites regional leaders to tackle energy poverty, shape fair energy future

27 November 2025 - Governments, partners, civil society and community leaders from across Europe gathered in Tbilisi at the Energy Community’s Just Transition Forum

serbia eps wind farm Kostolac trial operation

Serbia’s EPS starts trial operation of its first wind park Kostolac

27 November 2025 - The construction of Kostolac is complete, and EPS' first wind farm has generated its first megawatt-hours, the company said