News

Private partner sought for public lighting system

Published

April 28, 2016

Comments

comments icon

0

Share

Published:

April 28, 2016

Comments:

comments icon

0

Share

The Municipality of Žabalj, located in Serbia’s north, published an invitation for bids in an open procedure for a public–private partnership (PPP). The local authority will accept offers until May 30 from private entities for the reconstruction, rationalization and maintenance of public lighting. The preparatory period and implementation cannot exceed a total of six months and the guarantee cannot last longer than 13 years after that, the documentation said.

The procurement, without elements of a concession, is for measures aimed at efficient use of energy, a corresponding reduction in carbon dioxide emissions and a cut of operational costs. The main criterion is the lowest price and the decision will be made within 25 days from the opening of bids, the municipality said.

The contract is for 2,169 lights with a total capacity of 336 kW (or 403 kW with ballast) in 117 streets in four settlements. The project includes 1,442 mercury vapor lamps of 125 W and 727 sodium units. LED lights need to have life span of at least 60,000 hours without decreasing to less than 80% of the initial output (L80) or 80,000 hours with remaining at at least 70% of flux (L70).

Related Articles

nuscale small modular reactor smr fluor sale

US-based Fluor sells remaining stake in NuScale, technology supplier for Romania’s SMR project

27 April 2026 - Since September 2025, Fluor has earned a total of USD 2.43 billion from the sale of NuScale shares

bih elektroprivreda republike srpske ers loss 2025 trebinje petrovic

BiH’s power utility ERS reports EUR 29 million loss in 2025

27 April 2026 - Elektroprivreda Republike Srpske CEO Luka Petrović said the company operated under extremely difficult circumstances last year

New Akuo Southeastern Europe interview Bruno Bensasson

New Akuo is powering up in Southeastern Europe

27 April 2026 - The energy crisis is underscoring the necessity of renewables for energy security, alongside climate goals and competitiveness, CEO of Akuo Bruno Bensasson tells Balkan Green Energy News

croatia geolgical co2 storing ccs agency balen susnjar krpan

Croatia to analyze potential for geological CO2 storage

27 April 2026 - A grant agreement for the carbon dioxide capture and storage project was signed as part of the National Recovery and Resilience Plan