Electricity

Bulgaria-Romania day-ahead market coupling completed

Bulgaria-Romania day-ahead market coupling completed

Photo: Anrita1705 from Pixabay

Published

October 27, 2021

Country

,

Comments

0

Share

Published:

October 27, 2021

Country:

,

Comments:

0

Share

The Bulgaria-Romania day-ahead market coupling has been successfully completed today. With the Bulgaria-Romania power market project, their border was integrated under the European single day-ahead market coupling (SDAC) as foreseen by the European Union’s regulation.

The aim of SDAC is to create a single pan-European cross-zonal day-ahead electricity market (DAM). An integrated DAM increases the overall efficiency of trading by promoting effective competition, increasing liquidity and enabling a more efficient utilisation of generation resources across Europe.

With the inclusion of the Bulgarian-Romanian border, a geographical loop has been closed and the Southeast Europe (SEE) region is now fully integrated in the single day-ahead coupling, Bulgaria’s power exchange IBEX announced.

The Bulgaria-Romania market project is implemented by the NEMOs and transmission system operators (TSOs) of Bulgaria and Romania: IBEX, OPCOM, ESO EAD and Transelectrica.

According to IBEX, integration of the Bulgarian-Romanian bidding zone border into SDAC marks is yet another major achievement in the completion of the European target model.

In addition to the HVDC interconnection between Greece and Italy, the Greek and Bulgarian day-ahead markets are now also connected northbound via the Bulgarian-Romanian border with SDAC, IBEX said.

“Today, for the first time, day-ahead cross-zonal capacity between Romania and Bulgaria has been implicitly allocated via the Euphemia algorithm. The implemented price coupling allows for the simultaneous calculation of electricity prices and cross-border flows across the region,” IBEX said.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

europe flexibility seasonal balancing iea report

Flexibility needs to be met by demand response, batteries, hydrogen, but also thermal, hydropower plants – IEA

03 May 2024 - The report Managing the Seasonal Variability of Electricity Demand and Supply analyzes the situation in Europe, India, and Indonesia

drina-hydropower-plants

Court annuls environmental permit for Drina hydropower project

02 May 2024 - The construction of large hydropower plants on the Drina is facing new delays, after a court ruling to scrap the environmental permit for HPP Foča

el-dorado-electricity-imports-north-macedonia-rke

North Macedonia: ‘Solar El Dorado’ cuts electricity imports to 2.75%

02 May 2024 - In 2023, North Macedonia's new solar capacity increased by as much as 251% compared to 2022

EU-completing-Green-Deal-Industrial-Plan-Net-Zero-Industry-Act

EU completing Green Deal Industrial Plan as Net Zero Industry Act awaits go-ahead

01 May 2024 - The European Union's Net Zero Industry Act is about to come into force, completing legislative work within the Green Deal Industrial Plan