News

Government issues energy infrastructure decree

Published

March 23, 2016

Comments

comments icon

0

Share

Published:

March 23, 2016

Comments:

comments icon

0

Share

A new document regulates facilities, devices, networks and systems in energy infrastructure, as well as its management in the related industry. The decree issued by the Government of Slovenia covers power and gas distribution and networks, the system for liquid natural gas, the systems for liquefied petroleum gas, for the production and storage of natural gas, generation and distribution of district heating, as well as for other energy gases and the production of electricity and bringing it online for transmission and distribution, according to a report by Naš stik portal.

The document determines responsibility for keeping records of energy infrastructure and its content. The needed data includes the type of facility, device or network, basic technical information, who the owner and user are, potential load, maintenance and works performed. The contractor is obligated to report to the responsible ministry within 15 days from the request.

The new decree abolished the obligation to obtain the government’s approval for registering or removal from records of energy infrastructure, so the document does not anymore regulate mounting and connecting devices on electric power grid. The article adds the administrative obstacles are reduced for devices with weaker effect due to dimensions and safety features. Still, penalties remain for installing devices which are against regulation in the decree, the article adds.

Related Articles

serbia eu region bef 2026 grid flexibility panel

Renewable energy ambitions must include ways to ensure grid integration

22 May 2026 - Market participants in the region have differing views of the current state of the grid, according to a panel held at Belgrade Energy Forum 2026

Greece PPC Group raises EUR 4.5 billion in capital offering

Greece’s PPC Group raises EUR 4.5 billion in capital offering

22 May 2026 - Public Power Corp. conducted a historic share capital increase of EUR 4.5 billion. The government and existing stockholder CVC covered 55.6%.

DRI operating licence for Văcărești solar park in Romania

DRI gets operating licence for Văcărești solar park in Romania

22 May 2026 - DRI has received the commercial operating license for its 126 MW Văcărești solar park in Dâmbovița county near Bucharest

SANY Renewable Energy Alibunar wind parks Serbia end June 2026

SANY Renewable Energy to start building Alibunar wind parks in Serbia by end-June

22 May 2026 - SANY Renewable Energy has signed agreements with contractors for its wind power projects Alibunar 1 and 2 in northeastern Serbia