News

Government issues energy infrastructure decree

Published

March 23, 2016

Comments

comments icon

0

Share

Published:

March 23, 2016

Comments:

comments icon

0

Share

A new document regulates facilities, devices, networks and systems in energy infrastructure, as well as its management in the related industry. The decree issued by the Government of Slovenia covers power and gas distribution and networks, the system for liquid natural gas, the systems for liquefied petroleum gas, for the production and storage of natural gas, generation and distribution of district heating, as well as for other energy gases and the production of electricity and bringing it online for transmission and distribution, according to a report by Naš stik portal.

The document determines responsibility for keeping records of energy infrastructure and its content. The needed data includes the type of facility, device or network, basic technical information, who the owner and user are, potential load, maintenance and works performed. The contractor is obligated to report to the responsible ministry within 15 days from the request.

The new decree abolished the obligation to obtain the government’s approval for registering or removal from records of energy infrastructure, so the document does not anymore regulate mounting and connecting devices on electric power grid. The article adds the administrative obstacles are reduced for devices with weaker effect due to dimensions and safety features. Still, penalties remain for installing devices which are against regulation in the decree, the article adds.

Related Articles

slovenia subsidies prosumers solar batteries borzen

New EUR 30 million in subsidies for Slovenian prosumers

03 March 2026 - The funds are intended for legal entities, and the subsidy scheme will be implemented by electricity market operator Borzen

eu entsog report biomethane renewable gas injections

ENTSOG: Renewable gas injections in EU grids increase 12%

03 March 2026 - The European Network of Transmission System Operators for Gas has published its report on annual renewable gas injections into gas networks

Geothermal district heating EUR 200 million Bucharest Green Tech International

Geothermal district heating investment worth EUR 200 million starts in Bucharest

03 March 2026 - Romania-based Green Tech International declared the start of implementation of a geothermal district heating project in the northern part of Bucharest

solar output snow winter

Record solar output in Romania pushes power prices into negative territory

02 March 2026 - On Friday at 11:39 a.m., commercial solar output, excluding prosumers, reached 2,048 MW, while demand stood at slightly over 6,000 MW