Electricity

Montenegro announces coal phaseout by 2035

coal-phaseout-montenegro

TPP Pljevlja (photo EPCG)

Published

July 1, 2021

Country

Comments

comments icon

0

Share

Published:

July 1, 2021

Country:

Comments:

comments icon

0

Share

Montenegro has joined the Powering Past Coal Alliance (PPCA), which promotes coal phaseout and the transition to clean energy, and announced it would stop using coal by 2035 at the latest.

Prime Minister Zdravko Krivokapić has recently said that Montenegro will set a coal phaseout date in its national energy and climate plan (NECP), whose drafting is under way.

Welcoming the country’s decision to join the PPCA, Montenegrin non-governmental organization Green Home has said it demonstrates the commitment to setting a coal phaseout date and initiating the energy transition process.

Green Home recalled that the move comes at a time when the Energy Community Secretariat is conducting an infringement procedure against Montenegro for continuing to operate coal-fired thermal power plant (TPP) Pljevlja after it has exhausted the 20,000 operating hours allowed under the opt-out mechanism.

At the same time, governments across the Western Balkans are struggling to carry out environmental overhauls of thermal power plants, which would undoubtedly lead to continued dependence on coal, Green Home noted.

North Macedonia has a more ambitious target than Montenegro

Montenegro joined the PPCA at its summit in London, when the alliance was also joined by North Macedonia and Spain, with somewhat more ambitious goals. North Macedonia has announced plans to shut down its two thermal power plants by 2027 at the latest, while Spain has opted for carbon neutrality by 2030.

North Macedonia is the first country in the Western Balkans to make a decision on abandoning coal, with Prime Minister Zoran Zaev recently announcing that the closure of its thermal power plants is planned by 2028.

Croatia and Albania are also among the PPCA’s new members and partners

The PPCA has said on its website that its new members and partners also include Croatia, which has committed to working together with the alliance to set a coal phaseout date in the near future, and Albania, which has one of the highest shares of renewables in the region.

Green Home recalled that 16 European countries have set coal phaseout deadlines so far, indicating their commitment to Paris Agreement and climate neutrality goals.

Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

romania nuvve omnia bess battery brasov

Nuvve Holding, Swiss Omnia Global to install 120 MWh BESS in Romania

20 March 2026 - The BESS project in Braşov, a city in central Romania, is the third in Europe under a cooperation agreement of Nuvve Holding and Omnia Global

IEA urges demand-side measures to ease energy crisis from Iran war

IEA urges demand-side measures to ease energy crisis from Iran war

20 March 2026 - The escalating energy crisis from the Iran war can be eased with a range of demand-side measures spanning transportation, cooking and industrial production

energy community ecrb report electricity network tariffs

ECRB report maps reforms to modernize Energy Community electricity network tariffs 

20 March 2026 - The Energy Community Regulatory Board (ECRB) has released its 2025 Best Practice Report on electricity network tariff methodologies

Papastavrou Serbia can t be left out of blueprint for Vertical Gas Corridor

Papastavrou: Serbia can’t be left out of blueprint for Vertical Gas Corridor

20 March 2026 - Minister of Environment and Energy of Greece Stavros Papastavrou said Serbia can't be left out of the Vertical Gas Corridor for American gas