Electricity

ALPEX restarts tender for electronic power trading platform

ALPEX restarts tender electronic power trading platform

Alexandru Boicu on Unsplash

Published

June 30, 2021

Country

Comments

comments icon

0

Share

Published:

June 30, 2021

Country:

Comments:

comments icon

0

Share

The Albanian Electricity Exchange – ALPEX reopened the tender for the selection of a provider of an electronic trading platform for the day-ahead and intraday markets as none of the bids met the criteria.

The Albanian Electricity Exchange was scheduled to start operating in the third quarter, but it faces a possible delay as it failed in the first attempt to procure an electronic trading platform. ALPEX issued a public call in March for providers but none of the offers matched the terms, so now it relaunched the tender, Monitor.al reported.

The international competitive procurement bid for an ‘Electronic Trading Platform for the Day-Ahead and Intraday Market and Services Required for the Operation of the Organized Market in Albania and Kosovo’ kept the maximum value at EUR 1.9 million.

USAID prepared the terms of reference for the tender

The specifications remained the same. USAID prepared the terms of reference for the tender. The system needs to include clearing, risk management and the interface.

The article adds Albania would stimulate trading at the electricity market with contracts for difference (CfDs) as an interim measure. ALPEX intends to implement the European Union’s so-called target model for the day-ahead and intraday markets.

Transmission system operator of Albania OST founded ALPEX in October with its counterpart KOSTT from Kosovo*.

* This designation is without prejudice to positions on status and is in line with UNSCR 1244/99 and the ICJ Opinion on the Kosovo declaration of independence.
Comments (0)

Be the first one to comment on this article.

Enter Your Comment
Please wait... Please fill in the required fields. There seems to be an error, please refresh the page and try again. Your comment has been sent.

Related Articles

Montenegro first renewable energy auctions green transition

Montenegro preparing first renewable energy auction to accelerate green transition

03 June 2025 - A model for Montenegro's first auction for market premiums for solar power was outlined at an event in the capital Podgorica

bih trebinje zhongbo wind farm

Zhongbo Group to install wind farm near Trebinje

03 June 2025 - In September last year, the Government of the Republic of Srpska signed an agreement on strategic cooperation with Zhongbo Group

bih cbam cost analysis federation bih niksic

CBAM could cost BiH up to EUR 1.6 billion; PM Nikšić signals potential delay

03 June 2025 - The analysis was prepared by the Ministry of Foreign Trade and Economic Relations of BiH, with support from EU and the EU4Energy project

Wind power investments Turkey surge major plants inaugurated in May

Wind power investments in Turkey surge as major plants inaugurated in May

03 June 2025 - Investments in wind power in Turkey are expected to surpass USD 1.5 billion this year, translating to 1.5 GW of new capacity